Whirlpool ECKMF94 Installation Guide - Page 11

Preparing, the water, valve, tubing

Page 11 highlights

Preparing the water valve (for bottom freezers only) Refer to the side diagram for the following steps. tubing 1. Untape the coiled flexible tubing coming from the water valve and straighten it. 2. Starting at the top of the compression nut on the water valve, measure the tubing for 30: and mark the location on the tubing with a pen. 3. Use a pair of scissors or a hobby knife, and make an even cut across the water valve tubing at the 30'mark you made in the previous step. Discard the excess tubing. CUT TUBING HERE I II MAKE AN EVEN CUT ACROSS w Compression nut Water valve / Preparing the water valve tubing (for bottom freezers only) 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

Preparing
the water
valve
tubing
(for
bottom
freezers
only)
Refer to the side diagram for the following
steps.
CUT TUBING
HERE
1. Untape the coiled flexible tubing coming
from the water valve and straighten it.
2. Starting at the top of the compression nut
on the water valve, measure the tubing for
30: and mark the location on the tubing
with a pen.
3. Use a pair of scissors or a hobby knife, and
make an even cut across the water valve
tubing at the 30’mark
you made in the
previous step. Discard the excess tubing.
I II
MAKE
AN
EVEN CUT
ACROSS
w
Compression
nut
Water valve
/
Preparing the water valve tubing
(for bottom freezers only)
11