Canon BJC6500 Service Manual - Page 46
CONFIRMATION OF OPERATION, 1 Confirmation Methods
View all Canon BJC6500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 46 highlights
Part 2: MAINTENANCE BJC-6500 3. CONFIRMATION OF OPERATION 3.1 Confirmation Methods Confirming the operation of the printer after reassembly is possible by conducting the following procedures: 1) Offline, perform the print head position adjustment. Confirm that the print head position adjustment can be performed. For procedures, refer to Part 3: 2.1 Service Mode Operations (Page 3-8). 2) Offline, perform the service/factory test print. Confirm that the printing is correctly performed and that after 1) that misalignment does not appear. For procedures, refer to Part 3: 2.1 Service Mode Operations (Page 38). After replacing either the control board or the waste ink absorber, in addition to 1) and 2), it is necessary to confirm the following: On replacement of the: Control board Waste ink absorber Confirm that: On the service/factory test print, that the ROM version and model name are correct, and that the number of sheets passed and the total waste ink amount have been cleared. On the service/factory test print, that the total waste ink amount has been cleared. 2-18