Cisco WS-C4003-RF Hardware Maintenance Manual - Page 27

Installation Checklist, for Site

Page 27 highlights

Installation Checklist Installation Checklist The Installation Checklist (see Figure 2-1) lists all the procedures for initial hardware installation of new systems. Make a copy of this checklist and mark your entries. Include a copy of the checklist for each system in your Site Log. (See the "Site Log" section later in this section.) Figure 2-1 Installation Checklist Installation Checklist for Site Task Installation Checklist copied for each system Background information placed in Site Log Environmental specifications verified Site power voltages verified Installation site prepower check completed Required tools available Additional equipment available Router received Printed documentation or UniverCD received (if ordered) Product registration (in warranty package) completed and mailed Chassis components verified Software version verified Initial electrical connections established ASCII terminal attached to console port Signal distance limits verified Startup sequence steps completed Initial system operation verified Verified by Router name Router serial number Notes: Date Preparing for Installation 2-5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143

Preparing for Installation
2-5
Installation Checklist
Installation Checklist
The Installation Checklist (see Figure 2-1) lists all the procedures for initial hardware installation of
new systems. Make a copy of this checklist and mark your entries. Include a copy of the checklist
for each system in your Site Log. (See the “Site Log” section later in this section.)
Figure 2-1
Installation Checklist
Installation Checklist
for Site
__________________________________________________________
Router name________________________________
Router serial number__________________________
Notes:
Task
Verified by
Date
Installation Checklist copied for each system
Background information placed in Site Log
Environmental specifications verified
Site power voltages verified
Installation site prepower check completed
Required tools available
Additional equipment available
Router received
Printed documentation or UniverCD received (if ordered)
Product registration (in warranty package) completed and mailed
Chassis components verified
Software version verified
Initial electrical connections established
ASCII terminal attached to console port
Signal distance limits verified
Startup sequence steps completed
Initial system operation verified