HP StorageWorks 2/16V HP StorageWorks SAN Switch 2/8V, 2/16V and 2/16N Instal - Page 58
Powering the Switch On and Off, To end the flow of power to the SAN Switch 2/8V or SAN Switch 2/16V
View all HP StorageWorks 2/16V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 58 highlights
Managing the SAN Switches Powering the Switch On and Off To apply power to the SAN Switch 2/8V or SAN Switch 2/16V, connect at least one power cable to an AC receptacle on the switch and to a power source. The switch runs POST (power-on self-test) by default each time it is powered on, reset, or rebooted, and requires as long as 3 minutes. To end the flow of power to the SAN Switch 2/8V or SAN Switch 2/16V, remove the power cord from the power source. Note: Removing all power from the switch triggers a system reset. All devices are returned to their initial state the next time the switch is powered on. 58 SAN Switch 2/8V, 2/16V and 2/16N Installation Guide
Managing the SAN Switches
58
SAN Switch 2/8V, 2/16V and 2/16N Installation Guide
Powering the Switch On and Off
To apply power to the SAN Switch 2/8V or SAN Switch 2/16V, connect at least
one power cable to an AC receptacle on the switch and to a power source. The
switch runs POST (power-on self-test) by default each time it is powered on, reset,
or rebooted, and requires as long as 3 minutes.
To end the flow of power to the SAN Switch 2/8V or SAN Switch 2/16V, remove
the power cord from the power source.
Note:
Removing all power from the switch triggers a system reset. All devices are
returned to their initial state the next time the switch is powered on.