Husqvarna AUTOMOWER 310 Owner Manual - Page 19

To make a secondary area, To set the corridor width of the boundary wire

Page 19 highlights

B 0 cm / 0" A CAUTION: Do not put a section of • Put the boundary wire around the secondary boundary wire across the other. area (B) to make an island. Refer to To The sections of boundary wire make an island on page 18. must be parallel. Note: The boundary wire must be put as 1 loop around all of the work area (A + B). CAUTION: Do not put the guide wire across the boundary wire, for example a boundary wire that goes to an island. Note: When the product cuts grass in the secondary area, the Secondary area mode must be selected. Refer to Secondary area on page 34. 3.3.3.4 To make a secondary area Make a secondary area (B) if the work area has 2 areas that are not connected with a passage. The work area with the charging station is the main area (A). Note: The product must be manually moved between the main area and the secondary area. 3.3.3.5 To set the corridor width of the boundary wire The boundary wire corridor is the area adjacent to the boundary wire, which the product uses to find the charging station. When the product moves in the direction of the charging station, it always moves to the left of the boundary wire. 1. Do steps 1-3 in To get access to the menu on page 23. 2. Use the arrow buttons and the OK button to move through the menu structure Installation > Advanced > Corridor width > Boundary. 3. Use the number buttons to select a corridor width of 0 to 9. 4. Push the BACK button. 3.3.4 To examine where to put the guide wire • Put the guide wire in a line at a minimum of 2 m / 7 ft. in front of the charging station. • Make sure that the guide wire has as much free area as possible to the left of the guide wire when facing the charging station. Refer 1220 - 001 - 08.07.2019 Installation - 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

0 cm / 0
"
CAUTION:
Do not put a section of
boundary wire across the other.
The sections of boundary wire
must be parallel.
CAUTION:
Do not put the guide
wire across the boundary wire, for
example a boundary wire that
goes to an island.
3.3.3.4 To make a secondary area
Make a secondary area (B) if the work area has 2
areas that are not connected with a passage. The
work area with the charging station is the main
area (A).
Note:
The product must be manually moved
between the main area and the secondary area.
B
A
Put the boundary wire around the secondary
area (B) to make an island. Refer to
To
make an island on page 18
.
Note:
The boundary wire must be put as 1
loop around all of the work area (A + B).
Note:
When the product cuts grass in the
secondary area, the
Secondary area
mode
must be selected. Refer to
Secondary area
on page 34
.
3.3.3.5 To set the corridor width of the boundary
wire
The boundary wire corridor is the area adjacent
to the boundary wire, which the product uses to
find the charging station. When the product
moves in the direction of the charging station, it
always moves to the left of the boundary wire.
1.
Do steps 1–3 in
To get access to the menu
on page 23
.
2.
Use the
arrow buttons
and the
OK
button to
move through the menu structure
Installation
> Advanced > Corridor width > Boundary.
3.
Use the
number buttons
to select a corridor
width of 0 to 9.
4.
Push the
BACK
button.
3.3.4 To examine where to put the guide
wire
Put the guide wire in a line at a minimum of
2 m / 7 ft. in front of the charging station.
Make sure that the guide wire has as much
free area as possible to the left of the guide
wire when facing the charging station. Refer
1220 - 001 - 08.07.2019
Installation -
19