Intel SAI2 Product Specification - Page 73

Installation Instructions

Page 73 highlights

SAI2 Server Board TPS Regulatory and Integration Information This server board assembly has the following required certification type markings: • UL Joint Recognition Mark: Consists of small c (for Canada) followed by a stylized backward UR and followed by a small US (USA) (on component side). • Intel's UL File Number E139761 (Component side). • Battery "+" marking: located on the component side of the board in close proximity to the battery holder. • CE Mark: (Component side) • Australian C-Tick Mark: Consists of solid circle with white check mark and supplier code N232. • Russian GOST (Open letter "C" with the letter "P" inside the "C" and the letter "T" in the mouth of the "C". • Taiwan BSMI Certification mark. Two Chinese characters and an 8 digit number. 7.2 Installation Instructions CAUTION: Follow these guidelines to meet safety and regulatory requirements when installing this board assembly. Read and adhere to these instructions and to the instructions supplied with the host computer and associated modules. If the instructions for the host computer are inconsistent with these instructions or the instructions for associated modules, contact the supplier's technical support to find out how to ensure that the system meets safety and regulatory requirements. If the instructions are not followed, the user increases safety risk and the possibility of noncompliance with regional laws and regulations. 7.2.1 Ensure EMC Before computer integration, the host chassis, power supply, and other modules should pass EMC certification testing. In the installation instructions for the host chassis, power supply, and other modules, pay close attention to the following: • Certifications • External I/O cable shielding and filtering • Mounting, grounding, and bonding requirements • Keying connectors when mismating of connectors could be hazardous If the host chassis, power supply, and other modules have not passed applicable EMC certification testing before integration, EMC testing must be conducted on a representative sample of the newly completed computer. 7.2.2 Ensure Host Computer and Accessory Module Certifications The host computer and any added subassembly (such as a board or drive assembly, including internal or external wiring) should be certified for the region(s) where the end product will be used. Marks on the product are proof of certification. Certification marks are as follows: Revision 1.0 63

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82

SAI2 Server Board TPS
Regulatory and Integration Information
Revision 1.0
63
This server board assembly has the following required certification type markings:
UL Joint Recognition Mark: Consists of small c (for Canada) followed by a stylized
backward UR and followed by a small US (USA) (on component side).
Intel’s UL File Number E139761 (Component side).
Battery “+” marking: located on the component side of the board in close proximity to the
battery holder.
CE Mark: (Component side)
Australian C-Tick Mark: Consists of solid circle with white check mark and supplier code
N232.
Russian GOST (Open letter “C” with the letter “P” inside the “C” and the letter “T” in the
mouth of the “C”.
Taiwan BSMI Certification mark. Two Chinese characters and an 8 digit number.
7.2
Installation Instructions
CAUTION:
Follow these guidelines to meet safety and regulatory requirements when installing
this board assembly.
Read and adhere to these instructions and to the instructions supplied with the host computer
and associated modules. If the instructions for the host computer are inconsistent with these
instructions or the instructions for associated modules, contact the supplier’s technical support
to find out how to ensure that the system meets safety and regulatory requirements. If the
instructions are not followed, the user increases safety risk and the possibility of noncompliance
with regional laws and regulations.
7.2.1
Ensure EMC
Before computer integration, the host chassis, power supply, and other modules should pass
EMC certification testing.
In the installation instructions for the host chassis, power supply, and other modules, pay close
attention to the following:
Certifications
External I/O cable shielding and filtering
Mounting, grounding, and bonding requirements
Keying connectors when mismating of connectors could be hazardous
If the host chassis, power supply, and other modules have not passed applicable EMC
certification testing before integration, EMC testing must be conducted on a representative
sample of the newly completed computer.
7.2.2
Ensure Host Computer and Accessory Module Certifications
The host computer and any added subassembly (such as a board or drive assembly, including
internal or external wiring) should be certified for the region(s) where the end product will be
used. Marks on the product are proof of certification. Certification marks are as follows: