Weider 9900i Uk Manual - Page 16

Attach the Butterfly Frame 7 to the Top Frame

Page 16 highlights

20. Attach the Butterfly Frame (7) to the Top Frame (6) with two M10 x 93mm Bolts (63), two M10 20 Washers (88), and two M10 Locknuts (74). Do not fully tighten the Locknuts yet. Insert a Ball Detention Assembly (96) into the Left and Right Butterfly Arms (15, 16). 63 6 88 16 96 96 15 7 74 21. Finish attaching the Butterfly Frame (7) to the Top Frame (6) with two M10 x 117mm Bolts 21 (64), four M10 Washers (88), and two M10 Locknuts (74). See step 20. Tighten the M10 Locknuts (74). 6 74 88 88 64 7 16

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

16
20. Attach the Butterfly Frame (7) to the Top Frame
(6) with two M10 x 93mm Bolts (63), two M10
Washers (88), and two M10 Locknuts (74).
Do
not fully tighten the Locknuts yet.
Insert a Ball Detention Assembly (96) into the
Left and Right Butterfly Arms (15, 16).
20
21. Finish attaching the Butterfly Frame (7) to the
Top Frame (6) with two M10 x 117mm Bolts
(64), four M10 Washers (88), and two M10
Locknuts (74).
See step 20.
Tighten the M10 Locknuts (74).
21
63
88
74
88
88
64
74
6
6
7
96
96
16
7
15