Weider 9900i Uk Manual - Page 21

Attach the V-pulley 67 and a Cable Trap 71

Page 21 highlights

34. Route the High Cable (44) under a V-pulley (67). 34 Attach the V-pulley (67) and a Cable Trap (71) to the Upright (5) with an M10 x 57mm Bolt (93) and an M10 Locknut (74). Make sure that the Cable Trap is oriented to hold the High Cable in the groove of the V-pulley. Route the High Cable (44) through the slot in the side of the Top Cover (27) as shown. 27 Slot 74 71 67 93 44 5 35. Note: For clarity, the Top Cover (27) is not shown in this step. 35 Slide the Top Cover (not shown) as far forward as possible. Route the High Cable (44) upward through the Top Frame (6), over a Pulley (69), and downward through the Top Frame as shown. Make sure to leave slack in the High Cable in the indicated location. Attach the Pulley (69) inside the Top Frame (6) with an M10 x 65mm Bolt (75), two M10 Washers (88), two 12.7mm Spacers (73), and an M10 Locknut (74). Note: Another Pulley (not shown) will be installed in the Top Frame (6) in step 61. 69 74 88 73 44 6 73 88 75 Slack 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

21
34
34. Route the High Cable (44) under a V-pulley
(67).
Attach the V-pulley (67) and a Cable Trap (71)
to the Upright (5) with an M10 x 57mm Bolt (93)
and an M10 Locknut (74).
Make sure that the
Cable Trap is oriented to hold the High
Cable in the groove of the V-pulley.
Route the High Cable (44) through the slot in
the side of the Top Cover (27) as shown.
35
93
44
67
69
44
73
88
75
Slack
73
88
74
27
Slot
6
71
74
5
35.
Note: For clarity, the Top Cover (27) is not
shown in this step.
Slide the Top Cover (not shown) as far forward
as possible.
Route the High Cable (44) upward through the
Top Frame (6), over a Pulley (69), and down-
ward through the Top Frame as shown.
Make
sure to leave slack in the High Cable in the
indicated location.
Attach the Pulley (69) inside the Top Frame (6)
with an M10 x 65mm Bolt (75), two M10
Washers (88), two 12.7mm Spacers (73), and
an M10 Locknut (74).
Note: Another Pulley (not shown) will be
installed in the Top Frame (6) in step 61.