Adaptec 5325302057 User Guide - Page 199

Snap Server 720i Hardware Checklist

Page 199 highlights

Snap Server and Expansion Array Hardware Checklists Snap Server 720i Hardware Checklist The following checklist shows the required and optional hardware to install a Snap Server 720i, and indicates whether a component comes with the server or must be supplied by the customer. Component Network and Power Rack Expansion Description ; Ethernet Cables (3 per enclosure) Required to connect the Ethernet port(s) to the network. ; Power Cables (3 per enclosure) Required to plug into the mains (1 US, 1 UK, 1 EU). ‰ Ethernet Switches Use switches that support GbE. ‰ APC-Brand UPS Device(s) (optional) Snap Servers are designed to work with a USB-based or networkbased APC-brand UPS. Visit the APC Web site for a listing of optimal APC models. ; Slide Rail Assemblies (2 per enclosure) Two (2) slide rails and screws for attaching the server to a rack. ‰ 32 inch/36 inch, Four-post Rack You must use a 32-inch (or greater) four-post rack to mount this server. ; SAS Card Required to connect to an S50 expansion array. Appendix C Your Snap Server 700i Series 193

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236

Snap Server and Expansion Array Hardware Checklists
Appendix C
Your Snap Server 700i Series
193
Snap Server 720i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 720i, and indicates whether a component comes with the server or must be
supplied by the customer.
Component
Description
Network and
Power
Ethernet Cables (3 per enclosure)
Required to connect the Ethernet port(s) to the network.
Power Cables (3 per enclosure)
Required to plug into the mains (1 US, 1 UK, 1 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-
based APC-brand UPS. Visit the
APC Web site
for a listing of optimal
APC models.
Rack
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
Expansion
SAS Card
Required to connect to an S50 expansion array.