Adaptec 5325302057 User Guide - Page 200

Snap Server 730i and 750i Hardware Checklist, Componen, Description

Page 200 highlights

Snap Server and Expansion Array Hardware Checklists Snap Server 730i and 750i Hardware Checklist The following checklist shows the required and optional hardware to install a Snap Server 730i or 750i, and indicates whether a component comes with the server or must be supplied by the customer. Componen t Description Network and Power Rack Expansion ; Ethernet Cables (4 per enclosure) Required to connect the Ethernet port(s) to the network. ; Power Cables (6 per enclosure) Required to plug into the mains (2 US, 2 UK, 2 EU). ‰ Ethernet Switches Use switches that support GbE. ‰ APC-Brand UPS Device(s) (optional) Snap Servers are designed to work with a USB-based or network-based APC-brand UPS. Visit the APC Web site for a listing of optimal APC models. ; Slide Rail Assemblies (2 per enclosure) Two (2) slide rails and screws for attaching the server to a rack. ‰ 32 inch/36 inch, Four-post Rack You must use a 32-inch (or greater) four-post rack to mount this server. SAS Card ; Required to connect to an S50 expansion array. 194 Snap Server 700i Series User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236

Snap Server and Expansion Array Hardware Checklists
194
Snap Server 700i Series User’s Guide
Snap Server 730i and 750i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 730i or 750i, and indicates whether a component comes with the server or
must be supplied by the customer.
Componen
t
Description
Network and
Power
Ethernet Cables (4 per enclosure)
Required to connect the Ethernet port(s) to the network.
Power Cables (6 per enclosure)
Required to plug into the mains (2 US, 2 UK, 2 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-based
APC-brand UPS. Visit the
APC Web site
for a listing of optimal APC
models.
Rack
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
Expansion
SAS Card
Required to connect to an S50 expansion array.