Adobe 65030089 User Manual - Page 132

Con Resource Manager settings, Specify application-level Resource Manager settings

Page 132 highlights

USING ROBOHELP HTML 10 126 Working with topics Configure Resource Manager settings 1 Do one of the following: • Select Tools > Options. Click Resource Manager. • Select View > Pods > Resource Manager. Click the Resource Manager Settings button. 2 In the Options dialog box, specify application-level and project-level settings for Resource Manager. Specify application-level Resource Manager settings 1 In the Options dialog box, specify how you want to use shared resources in projects. Select either of the following options: As Copy Inserts a copy of a shared resource in the project. Resource Manager does not notify you or update the project if the original resource in the shared location is updated. As Linked Inserts a copy of a shared resource in the project and maintains a link between the copy (in the project) and the original (in the shared location). Maintaining a link helps Resource Manager to keep track of updates to the resource and allow you to update the resource in the project or in the shared location. Note: If a linked style sheet includes references to other resources, RoboHelp does not track updates to the referenced resources. 2 Specify the frequency of checking updates to linked resources. Note: Besides checking for updates according to this defined frequency, RoboHelp checks the status of linked resources when opening a project and when generating output. 3 Do one of the following: • Specify the frequency of refreshing the shared location. • Select Disable Auto-Refresh. Note: In either of these cases, you can use the Refresh icon in the Resource Manager pod for manual refresh. Specify project-level Resource Manager settings You can specify your preferences for the update of linked resources at a project level. For example, for project A, you can specify that Resource Manager should auto-update all linked resources if they are updated in the shared location. On the other hand, for project B, you can specify that Resource Manager should notify you if a linked resource is updated. To specify project-level settings for the update of linked resources: ❖ Select one of the following options: Notify Notifies if linked resources are different from their original versions in the shared location Do Not Notify Does not notify if linked resources are different from their original versions in the shared location Auto-Update Project Updates all linked resources in the project with the changes in the shared location Last updated 7/13/2012

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332
  • 333
  • 334
  • 335
  • 336
  • 337
  • 338
  • 339
  • 340
  • 341
  • 342
  • 343
  • 344
  • 345
  • 346
  • 347
  • 348
  • 349
  • 350
  • 351
  • 352
  • 353
  • 354
  • 355
  • 356
  • 357
  • 358
  • 359
  • 360
  • 361
  • 362
  • 363
  • 364
  • 365
  • 366
  • 367
  • 368
  • 369
  • 370
  • 371
  • 372
  • 373
  • 374
  • 375
  • 376
  • 377
  • 378
  • 379
  • 380
  • 381
  • 382
  • 383
  • 384
  • 385
  • 386
  • 387
  • 388
  • 389
  • 390
  • 391
  • 392
  • 393
  • 394
  • 395
  • 396
  • 397
  • 398
  • 399
  • 400
  • 401
  • 402
  • 403
  • 404
  • 405
  • 406
  • 407
  • 408
  • 409
  • 410
  • 411
  • 412
  • 413
  • 414
  • 415
  • 416
  • 417
  • 418
  • 419
  • 420
  • 421
  • 422

126
USING ROBOHELP HTML 10
Working with topics
Last updated 7/13/2012
Configure Resource Manager settings
1
Do one of the following:
Select Tools > Options. Click Resource Manager.
Select View > Pods > Resource Manager. Click the Resource Manager Settings button.
2
In the Options dialog box, specify application-level and project-level settings for Resource Manager.
Specify application-level Resource Manager settings
1
In the Options dialog box, specify how you want to use shared resources in projects. Select either of the following
options:
As Copy
Inserts a copy of a shared resource in the project. Resource Manager does not notify you or update the
project if the original resource in the shared location is updated.
As Linked
Inserts a copy of a shared resource in the project and maintains a link between the copy (in the project)
and the original (in the shared location). Maintaining a link helps Resource Manager to keep track of updates to the
resource and allow you to update the resource in the project or in the shared location.
Note:
If a linked style sheet includes references to other resources, RoboHelp does not track updates to the referenced
resources.
2
Specify the frequency of checking updates to linked resources.
Note:
Besides checking for updates according to this defined frequency, RoboHelp checks the status of linked resources
when opening a project and when generating output.
3
Do one of the following:
Specify the frequency of refreshing the shared location.
Select Disable Auto-Refresh.
Note:
In either of these cases, you can use the Refresh icon in the Resource Manager pod for manual refresh.
Specify project-level Resource Manager settings
You can specify your preferences for the update of linked resources at a project level. For example, for project A, you
can specify that Resource Manager should auto-update all linked resources if they are updated in the shared location.
On the other hand, for project B, you can specify that Resource Manager should notify you if a linked resource is
updated.
To specify project-level settings for the update of linked resources:
Select one of the following options:
Notify
Notifies if linked resources are different from their original versions in the shared location
Do Not Notify
Does not notify if linked resources are different from their original versions in the shared location
Auto-Update Project
Updates all linked resources in the project with the changes in the shared location