Bowflex Ultimate 2 Assembly Manual - Page 23
STEP 6, STEP 7, Requires Two People
View all Bowflex Ultimate 2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
22 Assembling Your Bowflex Ultimate® 2 STEP 6 Parts: • Base Assembly • Rod Box (Box 4) Tools: • Hex Key (7/32") Rod Box Pan Head Allen Bolt 4 3/4" 6-1 Leave Base in folded position and tilt forward to gain access to bottom of Rear Base. 6-2 Place the Rod Box through Rear Base and align with holes in base frame. 6-3 Install the 4 3/4" screw first to hold the Rod Box in position then install the four 3/4" screws. Pan Head Allen Bolt 3/4" 6-4 Install the two #8 x 3/4" screws to secure the rear base covers. Completely tighten all the hardware. Hardware (1:1): 2 Self Tapping Screws (#8 X 3/4") #8 x 3/4" Self Tapping Screw 2 Washers (#8) Washer 4 Pan Head Allen Bolt (3/8" X 3/4") 1 Pan Head Allen Bolt (3/8" X 4 3/4") STEP 7 (Requires Two People) Parts: • Base Assembly • Rod Pack (Box 1) Tools: • Phillips Head Screwdriver 7-1 Leave Base in folded position from step 6. Rod Pack 50 Lb. Rods facing down 7-2 Have one person align the Rod Pack with the slot in the Rod Box with the 50 Lb. rods facing down. 7-3 Have second person Install and completely tighten hardware. Hardware (1:1): 3 Self Tapping Screws (#10 X 1") 3 Washers (1/4") 5 Washers (3/8") Align with slot in Rod Box Self Tapping Screw Washer