Bowflex Ultimate 2 Assembly Manual - Page 37
Cable Installation, STEP 2
View all Bowflex Ultimate 2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 37 highlights
36 Installing Your Bowflex Ultimate® 2 Cables Cable Installation STEP 2 Tool: • Hex Key (7/32") a. In Box 4 Locate a Floating Pulley Assembly and a Single Pulley Assembly with two Cheeks. (See Figure A) b. Feed the cable through the Floating Pulley Assembly. (See Figure B) c. Route the cable behind the Side Plate and wrap over the Single Pulley Assembly. (See Figure C) d. Install Single Pulley with cable on the back side of the Lat Tower as shown. (See Figure D) Floating Pulley Assembly Single Pulley Assembly Cheeks Button Head Screw Pulley Figure A Washer (Rod Pack Removed For Clarity) Route Cable Through Floating Pulley Assembly Wrap Cable Over Single Pulley Assembly Washer Pan Head Al- len Bolt Route Cable Through Behind Side Plate Figure C Figure B Figure D