Bowflex Ultimate 2 Assembly Manual - Page 43

Operating Squat Attachment, Install Squat Attachment

Page 43 highlights

42 Installing Your Bowflex Ultimate® 2 Squat Attachment Install Squat Attachment (Continued from page 32) 6. Extend the Cable from the Chest Bar Sliding Pulley to the Hooks on both sides of the Squat Attachment. (See Figure E) Hook Sliding Pulley Cable Chest Bar Operating Squat Attachment 1. Unlock Seat T Handle. (See Figure A) 2. Stand under Squat Attachment with Shoulder Pads resting on shoulders. 3. Pull the Release Handle out and rotate it forward to allow the Squat Attachment slide freely on the Seat Rail. (See Figure F) Note: The Squat Attachment will not slide downward until you push upward to release the safety lock. Figure E

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

42
Operating Squat Attachment
1.
Unlock Seat T Handle.
(See Figure A)
2.
Stand under Squat Attachment with Shoulder Pads
resting on shoulders.
3.
Pull the Release Handle out and rotate it forward
to allow the Squat Attachment slide freely on the
Seat Rail.
(See Figure F)
Note:
The Squat Attachment will not slide
downward until you push upward to
release the safety lock.
Install Squat Attachment
(Continued from page 32)
6
. Extend the Cable from the Chest Bar Sliding Pulley to
the Hooks on both sides of the Squat Attachment.
(See Figure E)
Chest Bar
Sliding Pulley
Hook
Cable
Figure E
Installing Your Bowflex Ultimate
®
2 Squat Attachment