Bowflex Ultimate 2 Assembly Manual - Page 41
Cable Installation, STEP 6 - how to install attachments
View all Bowflex Ultimate 2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
40 Installing Your Bowflex Ultimate® 2 Cables Cable Installation STEP 6 Tool: • Hex Key (7/32") a. In Box 3, Locate a Single Pulley Assembly with two Cheeks and a Cable Retainer Bracket. (See Figure A) b. Extend the Cable to the front of the unit. c. Route the Cable under the Pulley and attach the Pulley to the Frame in front of the Bench Support. Pulley NOTE: Make sure the Bracket is oriented as shown. (Detail C) d. Replace the Ball Stop. (See Figure C and D ) Cheeks Cable Retainer Bracket Button Head Screw Figure A Detail C Slotted Insert Bench Support Pulley Cheek Button Head Screw Cable Retainer Bracket Figure B Slide Ball Tightly Against Insert and Cable End Cable End Ball Stop Figure C Replace Slotted Insert Figure D Repeat Cable Installation Steps 1-6 for the cables on the opposite side of the unit.