Brother International PT-9600 Service Manual - Page 81

Installing the Chassis Unit

Page 81 highlights

[ 5 ] Installing the Chassis Unit (1) Fit the chassis unit to the bosses in three places and secure it to the bottom cover with three screws. Secure FG wire "C" together. Note: Pay attention not to have any cables and harnesses between the bottom cover and the frame. (2) Fit the following harnesses on the main PCB ASSY. - Tape feed motor harness - Carriage motor harness - Eject motor harness - Tape control motor harness - Cutter sensor harness - AV cassette sensor harness (PT-9600/PT-3600 U.S.A.) - AV sensor harness (PT-9600/PT-3600 U.S.A.) - Thermal head harness Note: Apply the silicon grease (Shin-Etsu Chemical brand G501) by a half rice-grain sized drop on each gears. Thermal head harness AV cassette sensor harness (PT-9600/PT-3600 U.S.A.) Carriage motor harness Cutter sensor harness Eject motor harness Bottom cover Screws FG wire "C" Chassis unit Tape feed motor harness Boss Tape control motor harness AV sensor harness (PT-9600/PT-3600 U.S.A.) Boss Boss Fig. 3.2-31 Installing the Chassis Unit (1) III-47

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165

III-47
[ 5 ]
Installing the Chassis Unit
(1)
Fit the chassis unit to the bosses in three places and secure it to the bottom cover with three
screws.
Secure FG wire "C" together.
Note: Pay attention not to have any cables and harnesses between the bottom cover and
the frame.
(2)
Fit the following harnesses on the main PCB ASSY.
- Tape feed motor harness
- Carriage motor harness
- Eject motor harness
- Tape control motor harness
- Cutter sensor harness
- AV cassette sensor harness (PT-9600/PT-3600 U.S.A.)
- AV sensor harness (PT-9600/PT-3600 U.S.A.)
- Thermal head harness
Note: Apply the silicon grease (Shin-Etsu Chemical brand G501) by a half rice-grain sized
drop on each gears.
Fig. 3.2-31
Installing the Chassis Unit (1)
AV sensor harness
(PT-9600/PT-3600 U.S.A.)
Boss
AV cassette sensor harness
(PT-9600/PT-3600 U.S.A.)
FG wire “C”
Thermal head harness
Carriage motor harness
Cutter sensor harness
Eject motor harness
Bottom cover
Boss
Boss
Tape control motor harness
Tape feed motor harness
Chassis unit
Screws