D-Link DXS-3250E Installation Guide - Page 23
Preparing for Installation, Installation Precautions, Site Requirements
UPC - 790069308420
View all D-Link DXS-3250E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Mounting Device Preparing for Installation Preparing for Installation This section provides an explanation for preparing the installation site, and includes the following topics: • Installation Precautions • Site Requirements • Unpacking Installation Precautions Warnings • The surface on which the switch is placed should be adequately secured to prevent it from becoming unstable and/or falling over. • Ensure the power source circuits are properly grounded. • Observe and follow service markings. Do not service any product except as explained in your system documentation. Opening or removing covers marked with a triangular symbol with a lighting bolt may cause electrical shock. These components are to be serviced by trained service technicians only. • Ensure the power cable, extension cable, and/or plug is not damaged. • Ensure the product is not exposed to water. • Ensure the device is not exposed to radiators and/or heat sources. • Do not push foreign objects into the device, as it may cause a fire or electric shock. • Use the device only with approved equipment. • Allow the product to cool before removing covers or touching internal equipment. • Ensure the switch does not overload the power circuits, wiring, and over-current protection. To determine the possibility of overloading the supply circuits, add together the ampere ratings of all devices installed on the same circuit as the device being installed. Compare this total with the rating limit for the circuit. The maximum ampere ratings are usually printed on the switch, near their AC power connectors. Cautions • Ensure the air flow around the front, sides, and back of the switch is not restricted. • Ensure the cooling vents are not blocked. • Do not install the switch in an environment where the operating ambient temperature might exceed 40ºC (104ºF). Site Requirements The device is placed on a table-top. Before installing the unit, verify that the location chosen for installation meets the following site requirements. • General - Ensure that the power supply is correctly installed. • Power - The unit is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 100-250 VAC, 50- 60 Hz. • Clearance - There is adequate frontal clearance for operator access. Allow clearance for cabling, power connections and ventilation. • Cabling - The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines and fluorescent lighting fixtures. Page 22