Dell PowerSwitch S4820T Installing the S4820T System - Page 19
Install the Dell ReadyRails System, Installing ReadyRails - Two-Post Flush-Mount Configuration
View all Dell PowerSwitch S4820T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
• Reverse air flow - To ensure cool air intake and to avoid hot air blow out from the I/O panel, ensure you have the necessary clearance. • Reliable earthing - Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit; for example, the use of the power strips. • Do not mount the equipment with the Utility panel facing in the downward position. NOTE: These instructions are a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. NOTE: The illustrations in this document are not intended to represent a specific switch. Install the Dell ReadyRails System Dell Networking provides the ReadyRails rack mounting system so you can easily configure a rack to install the S4820T switch. You can install the ReadyRails system using the 1U tool-less method or one of three possible 1U tooled methods (two-post flush mount, two-post center mount, or four-post threaded). Refer to the appropriate instructions for the mounting configuration you're using: Installing ReadyRails - Tool-less Method Installing ReadyRails - Two-Post Flush-Mount Configuration Installing ReadyRails - Two-Post Center-Mount Configuration Installing ReadyRails - Four-Post Threaded Configuration Install the Hardware 19