Dell PowerSwitch S4820T Installing the S4820T System - Page 24
each end, as shown in items 2 and 3 in the following from each flange ear
View all Dell PowerSwitch S4820T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
NOTE: Retain the castings for future rack requirements. 1. Remove the flange ear castings from each end of the ReadyRails assemblies. Remove the two screws from each flange ear, and remove each casting with a Torx driver, as shown in item 1 in the figure. 2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, as shown in items 2 and 3 in the following figure. Figure 7. Four-post Threaded Configuration 24 Install the Hardware
NOTE:
Retain the castings for future rack requirements.
1.
Remove the flange ear castings from each end of the ReadyRails assemblies. Remove the two screws
from each flange ear, and remove each casting with a Torx driver, as shown in item 1 in the figure.
2.
For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at
each end, as shown in items 2 and 3 in the following figure.
Figure 7. Four-post Threaded Configuration
24
Install the Hardware