Dell PowerSwitch S4820T Installing the S4820T System - Page 8

Prerequisites, 10GBase-T Ports

Page 8 highlights

Figure 2. S4820T I/O-Side View 1. 10GBase-T Ports 3. USB Port 2. QSFP+ Ports NOTE: The RJ-45 ports on the I/O side are labeled 0-47. When you cable these ports, be sure not to interfere with the airflow from the small vent holes above and below the ports. The S4820T switch runs the Dell Networking operating system (FTOS), providing switching, bridging, and routing functionality for transmitting data, storage, and server traffic. In a data center network, the S4820T switch provides converged network support and inter-operates with Dell and third-party ToR devices. The switch supports data center bridging (DCB) features and optimizes connectivity between servers and storage devices using Fibre Channel over Ethernet (FCoE) and internet small computer system interface (iSCSI) links. By providing increased 40GbE bandwidth for device interconnection in a shared network storage environment (with the possibility of splitting 40GbE quad small form-factor pluggable plus (QSFP+) uplinks into four 10GbE SFP+ or RJ-45 connections), the S4820T switch is perfectly positioned to help transition a data center with multiple speed requirements. Additionally, the S4820T solution is optimized to provide 10Gbps throughput for distances of up to: • 330 feet (100 meters) over Cat6, 6A, and 7 shielded copper cable and Cat6A UTP copper cable • 181.5 feet (55 meters) over Cat6 UTP copper cable Prerequisites Detailed installation instructions for the S4820T are provided in Site Preparationsand in Install the Hardware sections. To successfully install the S4820T, ensure that you have the following: • S4820T chassis (or multiple chassis, if stacking) • At least one grounded AC or DC power source per chassis • Cable to connect the AC or DC power source to the chassis (US AC power cables included) • Mounting brackets for rack installation (included) • Screws for rack installation and #1 and #2 Phillips screwdrivers (not included) • Ground cable (not included) • Ground cable screws (included) • Copper/fiber cables 8 The S4820T Switch

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59

Figure 2. S4820T I/O-Side View
1.
10GBase-T Ports
2.
QSFP+ Ports
3.
USB Port
NOTE:
The RJ-45 ports on the I/O side are labeled 0-47. When you cable these ports, be sure not
to interfere with the airflow from the small vent holes above and below the ports.
The S4820T switch runs the Dell Networking operating system (FTOS), providing switching, bridging, and
routing functionality for transmitting data, storage, and server traffic.
In a data center network, the S4820T switch provides converged network support and inter-operates
with Dell and third-party ToR devices. The switch supports data center bridging (DCB) features and
optimizes connectivity between servers and storage devices using Fibre Channel over Ethernet (FCoE)
and internet small computer system interface (iSCSI) links.
By providing increased 40GbE bandwidth for device interconnection in a shared network storage
environment (with the possibility of splitting 40GbE quad small form-factor pluggable plus (QSFP+)
uplinks into four 10GbE SFP+ or RJ-45 connections), the S4820T switch is perfectly positioned to help
transition a data center with multiple speed requirements.
Additionally, the S4820T solution is optimized to provide 10Gbps throughput for distances of up to:
330 feet (100 meters) over Cat6, 6A, and 7 shielded copper cable and Cat6A UTP copper cable
181.5 feet (55 meters) over Cat6 UTP copper cable
Prerequisites
Detailed installation instructions for the S4820T are provided in
Site Preparations
and in
Install the
Hardware
sections. To successfully install the S4820T, ensure that you have the following:
S4820T chassis (or multiple chassis, if stacking)
At least one grounded AC or DC power source per chassis
Cable to connect the AC or DC power source to the chassis (US AC power cables included)
Mounting brackets for rack installation (included)
Screws for rack installation and #1 and #2 Phillips screwdrivers (not included)
Ground cable (not included)
Ground cable screws (included)
Copper/fiber cables
8
The S4820T Switch