Dell S3048-ON Networking S3048–ON Getting Started Guide - Page 10
Four-Post Threaded Configuration
![]() |
View all Dell S3048-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
Figure 3. Two-Post Center-Mount Configuration Four-Post Threaded Configuration To install the Dell ReadyRails system using the four-post threaded configuration, follow these steps. 1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. Use a Torx driver to remove the two screws from each flange ear and remove each casting. Refer to item 1 of the following figure. Retain the castings for future rack requirements. 2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer to item 2 of the following figure. Install the Hardware 10
![](/manual_guide/products/dell-s3048on-networking-s3048x2013on-getting-started-guide-cba1c6d/10.png)
Figure 3. Two-Post Center-Mount Configuration
Four-Post Threaded Configuration
To install the Dell ReadyRails system using the four-post threaded configuration,
follow these steps.
1
For this configuration, remove the flange ear castings from each end of the
ReadyRails assemblies. Use a Torx driver to remove the two screws from each
flange ear and remove each casting. Refer to item 1 of the following figure.
Retain the castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to item 2 of the following figure.
Install the Hardware
10