Dell S3048-ON Networking S3048–ON Getting Started Guide - Page 10

Four-Post Threaded Configuration

Page 10 highlights

Figure 3. Two-Post Center-Mount Configuration Four-Post Threaded Configuration To install the Dell ReadyRails system using the four-post threaded configuration, follow these steps. 1 For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. Use a Torx driver to remove the two screws from each flange ear and remove each casting. Refer to item 1 of the following figure. Retain the castings for future rack requirements. 2 For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. Refer to item 2 of the following figure. Install the Hardware 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

Figure 3. Two-Post Center-Mount Configuration
Four-Post Threaded Configuration
To install the Dell ReadyRails system using the four-post threaded configuration,
follow these steps.
1
For this configuration, remove the flange ear castings from each end of the
ReadyRails assemblies. Use a Torx driver to remove the two screws from each
flange ear and remove each casting. Refer to item 1 of the following figure.
Retain the castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to item 2 of the following figure.
Install the Hardware
10