Dell S3048-ON Networking S3048–ON Getting Started Guide - Page 8

Two-Post Flush-Mount Configuration

Page 8 highlights

Figure 1. 1U Tool-less Configuration Two-Post Flush-Mount Configuration To install the Dell ReadyRails system using the two-post flush-mount configuration, follow these steps. 1 For this configuration, remove the castings from the front side of each ReadyRails assembly. Refer to item 1 in the following figure. Use a Torx driver to remove the two screws from each front flange ear (on the switch side of the rail) and remove each casting. Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings. 2 Attach one rail to the front post flange with two user-supplied screws. Refer to item 2 in the following figure. 3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws. Refer to item 3 in the following figure. 4 Repeat this procedure for the second rail. Install the Hardware 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

Figure 1. 1U Tool-less Configuration
Two-Post Flush-Mount Configuration
To install the Dell ReadyRails system using the two-post flush-mount configuration,
follow these steps.
1
For this configuration, remove the castings from the front side of each
ReadyRails assembly. Refer to item 1 in the following figure. Use a Torx driver to
remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain the castings for future rack requirements.
It is not necessary to remove the rear flange castings.
2
Attach one rail to the front post flange with two user-supplied screws. Refer to
item 2 in the following figure.
3
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. Refer to item
3 in the following figure.
4
Repeat this procedure for the second rail.
Install the Hardware
8