Dell S3048-ON Networking S3048–ON Getting Started Guide - Page 9

Two-Post Center-Mount Configuration

Page 9 highlights

Figure 2. Two-Post Flush-Mount Configuration Two-Post Center-Mount Configuration To install the Dell ReadyRails system using the two-post center-mount configuration, follow these steps. 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws. Refer to item 1 in the following figure. 2 Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws. Refer to item 2 of the following figure. 3 Repeat this procedure for the second rail. Install the Hardware 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31

Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer to item 1
in the following figure.
2
Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to item 2 of the following figure.
3
Repeat this procedure for the second rail.
Install the Hardware
9