Dell S3048-ON Networking S3048–ON Getting Started Guide - Page 9
Two-Post Center-Mount Configuration
View all Dell S3048-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Figure 2. Two-Post Flush-Mount Configuration Two-Post Center-Mount Configuration To install the Dell ReadyRails system using the two-post center-mount configuration, follow these steps. 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws. Refer to item 1 in the following figure. 2 Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws. Refer to item 2 of the following figure. 3 Repeat this procedure for the second rail. Install the Hardware 9
Figure 2. Two-Post Flush-Mount Configuration
Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer to item 1
in the following figure.
2
Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to item 2 of the following figure.
3
Repeat this procedure for the second rail.
Install the Hardware
9