Dell Z9100 EMC PowerSwitch –ON Installation Guide March 2021 - Page 10

Prerequisites, Z9100–ON configurations

Page 10 highlights

Prerequisites The following is a list of components needed for successful installation of the Z9100-ON: NOTE: Detailed installation instructions for the Z9100-ON are provided in Site Preparations and Install the Z9100-ON. ● Z9100-ON switch, or multiple switches if stacking ● AC or DC country- and regional-specific cables. Used to connect the AC or DC power source to each of the switches' AC or DC power supplies. ● ReadyRail™ mounting brackets for rack installation, included ● Screws for rack installation ● #1 and #2 Phillips screwdrivers, not included ● Ground cable screws for L-bracket, included ● Copper and fiber cables Other components are: ● Ground cable screw, M3 or M4 depending on your switch ● Extra mounting brackets Z9100-ON configurations You can order the Z9100-ON switch in several configurations. You can order the following supported hardware components: ● Z9100-ON AC or DC normal airflow: thirty-two 10/25/40/50/100 GbE ports with two SFP+ 10 GbE ports, two AC or DC power supply and five fan subsystems. Airflow is from the I/O side to the power supply side. ● Z9100-ON AC or DC reverse airflow: thirty-two 10/25/40/50/100 GbE ports with two SFP+ 10 GbE ports, two AC or DC power supply and five fan subsystems. Airflow from the power supply side to the I/O side. ● Fan with airflow from the I/O side to the PSU side-normal airflow ● Fan with airflow from the PSU side to the I/O side-reverse airflow ● AC or DC power supply with airflow from the I/O side to the PSU side-normal airflow ● AC or DC power supply with airflow from the PSU side to the I/O side-reverse airflow 10 The Z9100-ON switch

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45

Prerequisites
The following is a list of components needed for successful installation of the Z9100-ON:
NOTE:
Detailed installation instructions for the Z9100-ON are provided in
Site Preparations
and
Install the Z9100-ON
.
Z9100–ON switch, or multiple switches if stacking
AC or DC country- and regional-specific cables. Used to connect the AC or DC power source to each of the switches’ AC or
DC power supplies.
ReadyRail™ mounting brackets for rack installation, included
Screws for rack installation
#1 and #2 Phillips screwdrivers, not included
Ground cable screws for L-bracket, included
Copper and fiber cables
Other components are:
Ground cable screw, M3 or M4 depending on your switch
Extra mounting brackets
Z9100–ON configurations
You can order the Z9100–ON switch in several configurations.
You can order the following supported hardware components:
Z9100–ON AC or DC normal airflow: thirty–two 10/25/40/50/100 GbE ports with two SFP+ 10 GbE ports, two AC or DC
power supply and five fan subsystems. Airflow is from the I/O side to the power supply side.
Z9100–ON AC or DC reverse airflow: thirty–two 10/25/40/50/100 GbE ports with two SFP+ 10 GbE ports, two AC or DC
power supply and five fan subsystems. Airflow from the power supply side to the I/O side.
Fan with airflow from the I/O side to the PSU side—normal airflow
Fan with airflow from the PSU side to the I/O side—reverse airflow
AC or DC power supply with airflow from the I/O side to the PSU side—normal airflow
AC or DC power supply with airflow from the PSU side to the I/O side—reverse airflow
10
The Z9100–ON switch