Lexmark WinWriter 150c Service Manual - Page 36

Base Assembly Removal, Carrier Belt Removal, Note: when reinstalling the machine on the base assembly

Page 36 highlights

4077-001 Base Assembly Removal 1. Remove the front cover. 2. Remove the rear cover. 3. Disconnect the power supply connector at the system board. 4. Unlatch the two ejectors from the large feed roll shaft by pushing down the ejectors where they grip the large feed roll shaft. 5. Remove the two screws securing the carrier frame to the base cover. 6. Remove the ground straps from the carrier frame. Slide the maintenance assembly out of the carrier frame. 7. Slide the machine off the base cover. Note: when reinstalling the machine on the base assembly, be sure to connect the ejectors to the large feed roll shaft. Carrier Belt Removal 1. Remove the front cover. 2. Remove the carrier assembly. 3. Push the idler pulley to the right to release the tension on the belt and remove the belt. 27

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

4077-001
27
Base Assembly Removal
1.
Remove the front cover.
2.
Remove the rear cover.
3.
Disconnect the power supply connector at the system board.
4.
Unlatch the two ejectors from the large feed roll shaft by pushing
down the ejectors where they grip the large feed roll shaft.
5.
Remove the two screws securing the carrier frame to the base
cover.
6.
Remove the ground straps from the carrier frame. Slide the
maintenance assembly out of the carrier frame.
7.
Slide the machine off the base cover.
Note: when reinstalling the machine on the base assembly, be
sure to connect the ejectors to the large feed roll shaft
.
Carrier Belt Removal
1.
Remove the front cover.
2.
Remove the carrier assembly.
3.
Push the idler pulley to the right to release the tension on the belt
and remove the belt.