Panasonic CT32SC13G Service Manual - Page 12

X-Ray Protection Circuit Check& Adjustments - flyback

Page 12 highlights

http://tsn.pstc.panasonic.com/viewing/NA/CT-36SL13G/SVC/s0201000000.html 2.1 X-Ray Protection Circuit Check& Adjustments TOP PREVIOUS NEXT This test must be performed as final check before the receiver is returned to the customer. If voltages are out of tolerance, immediate service and correction is required to insure safe operation and to prevent the possibility of premature componentfailure. Equipment: 1. Isolation transformer. 2. High voltage meter. 3. D.C. Ammeter 4. Short jumper. 5. HHS jig (See figure below). Diode Connection Jumper. Preparation: 1. Make sure the receiver is turned off. 2. Connect the receiver to an isolation transformer. 3. Connect the ammeter serial from the flyback anode lead to the picture tube anode socket. 4. Prepare short jumper and HHS jig. Procedure: http://tsn.pstc.panasonic.com/viewing/NA/CT-36SL13G/SVC/s0201000000.html (1 of 2)05.12.2008 0:00:36

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187

2.1 X-Ray Protection Circuit Check& Adjustments
TOP
PREVIOUS
NEXT
This test must be performed as final check before the receiver is returned to the customer. If voltages are
out of tolerance, immediate service and correction is required to insure safe operation and to prevent the
possibility of premature componentfailure.
Equipment:
1.
Isolation transformer.
2.
High voltage meter.
3.
D.C. Ammeter
4.
Short jumper.
5.
HHS jig (See figure below).
Diode Connection Jumper.
Preparation:
1.
Make sure the receiver is turned off.
2.
Connect the receiver to an isolation transformer.
3.
Connect the ammeter serial from the flyback anode lead to the picture tube anode socket.
4.
Prepare short jumper and HHS jig.
Procedure: