Dell PowerStore 3200T EMC PowerStore Installation and Service Guide for PowerS - Page 114

Transfer parts from the faulted node to the replacement node, Install the top cover on the node

Page 114 highlights

Figure 136. Removing the top cover Transfer parts from the faulted node to the replacement node Transfer the following components from the faulted node to the corresponding locations in the replacement node. To help ensure the correct placement in the enclosure, transfer only one component at a time. NOTE: Confirm that all parts are fully seated before inserting the node into the base enclosure. NOTE: Do not add any components while the node is powering on. ● Transfer the power supply. ● Transfer the I/O modules and fillers. ● Transfer the embedded module without removing the 4-port card. ● Transfer the internal M.2 boot modules without removing them from the adapters. ● Transfer DIMMs. NOTE: Move DIMMs one at a time from the faulted node to the same slot on the replacement node. ● Transfer internal fans. ● Transfer the internal battery backup module. Install the top cover on the node Steps 1. Position the top cover over the node and align it with the slots in the sides at the rear of the node. 114 Base enclosure service procedures

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191

Figure 136. Removing the top cover
Transfer parts from the faulted node to the replacement node
Transfer the following components from the faulted node to the corresponding locations in the replacement node.
To help ensure the correct placement in the enclosure, transfer only one component at a time.
NOTE:
Confirm that all parts are fully seated before inserting the node into the base enclosure.
NOTE:
Do not add any components while the node is powering on.
Transfer the
power supply
.
Transfer the
I/O modules
and fillers.
Transfer the
embedded module
without removing the 4-port card.
Transfer the
internal M.2 boot modules
without removing them from the adapters.
Transfer
DIMMs
.
NOTE:
Move DIMMs one at a time from the faulted node to the same slot on the replacement node.
Transfer
internal fans
.
Transfer the
internal battery backup module
.
Install the top cover on the node
Steps
1.
Position the top cover over the node and align it with the slots in the sides at the rear of the node.
114
Base enclosure service procedures