Dell PowerStore 3200T EMC PowerStore Installation and Service Guide for PowerS - Page 30

Choose where to install the expansion enclosure, Removing a filler panel, Black and gray C13/C14

Page 30 highlights

Component Power cords, either Black and gray C13/C14 Black and gray C13/C20 Bezel for NVMe expansion enclosure (with key) Quantity 2 1 100G QSFP28 cables to 2 connect the base enclosure to the NVMe expansion enclosure, the NVMe expansion enclosure to another NVMe expansion enclosure, and to loopback from the NVMe expansion enclosure to the base enclosure. NOTE: The first NVMe expansion enclosure ships with four 100G QSFP28 cables. The second and third NVMe expansion enclosure ship with two 100G QSFP28 cables. Choose where to install the expansion enclosure Before installing the new expansion enclosure, you should determine the placement of the new expansion enclosure within the rack. Steps 1. It is recommended that you install the expansion enclosure in the next available 2U space directly above the base enclosure or the last expansion enclosure in the system. Most cabinets mark 1U increments with horizontal lines or small holes in the channels. 2. Considering these recommendations, choose a 2U space in the cabinet for the expansion enclosure. Removing a filler panel About this task In most cases, the front space into which you will install the enclosure is covered by a filler panel. Steps If one or more filler panels cover the space where you want to install the enclosure, remove each panel. 30 Install a new base enclosure and optional expansion enclosure

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191

Component
Quantity
Power cords, either
Black and gray C13/C14
Black and gray C13/C20
2
Bezel for NVMe expansion
enclosure (with key)
1
100G QSFP28 cables to
connect the base enclosure
to the NVMe expansion
enclosure, the NVMe
expansion enclosure to
another NVMe expansion
enclosure, and to loopback
from the NVMe expansion
enclosure to the base
enclosure.
NOTE:
The first NVMe
expansion enclosure
ships with four 100G
QSFP28 cables. The
second and third NVMe
expansion enclosure ship
with two 100G QSFP28
cables.
2
Choose where to install the expansion enclosure
Before installing the new expansion enclosure, you should determine the placement of the new expansion enclosure within the
rack.
Steps
1.
It is recommended that you install the expansion enclosure in the next available 2U space directly above the base enclosure
or the last expansion enclosure in the system.
Most cabinets mark 1U increments with horizontal lines or small holes in the channels.
2.
Considering these recommendations, choose a 2U space in the cabinet for the expansion enclosure.
Removing a filler panel
About this task
In most cases, the front space into which you will install the enclosure is covered by a filler panel.
Steps
If one or more filler panels cover the space where you want to install the enclosure, remove each panel.
30
Install a new base enclosure and optional expansion enclosure