Dell PowerStore 3200T EMC PowerStore Installation and Service Guide for PowerS - Page 49

Closing the cable management arms, Cabling three expansion enclosures

Page 49 highlights

Figure 43. Cabling three expansion enclosures Closing the cable management arms About this task Perform this procedure to close the cable management arms. Steps 1. Close the lower cable management arm: a. Swing the lower cable management arm to the left side of the enclosure, and align the retention latch with the lower rail bracket. b. Press the retention latch onto the lower rail bracket. c. Make sure that you hear the audible click that indicates that the lower cable management arm is in place. 2. Close the upper cable management arm: a. Swing the upper cable management arm to the right side of the enclosure, and align the retention latch with the upper rail bracket. b. Press the retention latch onto the upper rail bracket. c. Make sure that you hear the audible click that indicates that the upper cable management arm is in place. Example Figure 44. Closing the cable management arms Install a new base enclosure and optional expansion enclosure 49

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191

Figure 43. Cabling three expansion enclosures
Closing the cable management arms
About this task
Perform this procedure to close the cable management arms.
Steps
1.
Close the lower cable management arm:
a.
Swing the lower cable management arm to the left side of the enclosure, and align the retention latch with the lower rail
bracket.
b.
Press the retention latch onto the lower rail bracket.
c.
Make sure that you hear the audible click that indicates that the lower cable management arm is in place.
2.
Close the upper cable management arm:
a.
Swing the upper cable management arm to the right side of the enclosure, and align the retention latch with the upper
rail bracket.
b.
Press the retention latch onto the upper rail bracket.
c.
Make sure that you hear the audible click that indicates that the upper cable management arm is in place.
Example
Figure 44. Closing the cable management arms
Install a new base enclosure and optional expansion enclosure
49