Compaq ProLiant 400 ProLiant ML330 Setup and Installation Guide - Page 24

Selecting a Site, Unpacking the Server, Locating Materials

Page 24 highlights

2-2 Compaq ProLiant ML330 Setup and Installation Guide Selecting a Site Make sure that the installation area you select has the following features: Sturdy, level installation site that includes dedicated and properly grounded circuits, air conditioning, and static electricity protection 7.6-cm (3-in) clearance on all sides of server for proper ventilation Separate electrical circuit for the server CAUTION: Protect the server from power fluctuations and temporary interruptions with a regulating uninterruptible power supply (UPS). This device protects the hardware from damage caused by power surges and voltage spikes and keeps the system in operation during a power failure. Unpacking the Server Unpack the server, keyboard, and cables according to the instructions and illustrations printed on the Quick Start Poster. Locating Materials Locate the following materials that were shipped with your ProLiant ML330: Keyboard Mouse Power cord Documentation label inside the server (most of the option installation and setup instructions are located on the label, which is attached to the inside of the access panel). See Chapter 3, "Hardware Options Installation" for instructions on removing the access panel. Documentation and software packs inside the shipping box In addition to these supplied items, you may need: Torx T-15 screwdriver Phillips screwdriver Options or peripherals, such as expansion boards, monitors, uninterruptible power supply (UPS), memory, or drives Application software

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99

2-2
Compaq ProLiant ML330 Setup and Installation Guide
Selecting a Site
Make sure that the installation area you select has the following features:
Sturdy, level installation site that includes dedicated and properly
grounded circuits, air conditioning, and static electricity protection
7.6-cm (3-in) clearance on all sides of server for proper ventilation
Separate electrical circuit for the server
CAUTION:
Protect the server from power fluctuations and temporary
interruptions with a regulating uninterruptible power supply (UPS). This device
protects the hardware from damage caused by power surges and voltage spikes
and keeps the system in operation during a power failure.
Unpacking the Server
Unpack the server, keyboard, and cables according to the instructions and
illustrations printed on the Quick Start Poster.
Locating Materials
Locate the following materials that were shipped with your ProLiant ML330:
Keyboard
Mouse
Power cord
Documentation label inside the server (most of the option installation
and setup instructions are located on the label, which is attached to the
inside of the access panel). See Chapter 3, “Hardware Options
Installation” for instructions on removing the access panel.
Documentation and software packs inside the shipping box
In addition to these supplied items, you may need:
Torx T-15 screwdriver
Phillips screwdriver
Options or peripherals, such as expansion boards, monitors, uninterruptible
power supply (UPS), memory, or drives
Application software