Dell Force10 S4820T Installing the S4820T System - Page 17
Site Location and Preparation
View all Dell Force10 S4820T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
3 Site Location and Preparation The S4820T is suitable for installation as part of a Common Bond Network (CBN). It can be installed in: • Network telecommunication facilities • Data centers • Other locations where the National Electric Code (NEC) applies This chapter contains the following sections regarding where and how the S4820T should be installed: • Site Selection • Cabinet Placement • Rack Mounting • Grounding • Fans and Airflow • Power • Storing Components NOTE: Install the S4820T system into a rack or cabinet before installing any optional components. Site Location and Preparation | 17
Site Location and Preparation
|
17
3
Site Location and Preparation
The S4820T is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
•
Network telecommunication facilities
•
Data centers
•
Other locations where the National Electric Code (NEC) applies
This chapter contains the following sections regarding where and how the S4820T should be installed:
•
Site Selection
•
Cabinet Placement
•
Rack Mounting
•
Grounding
•
Fans and Airflow
•
Power
•
Storing Components
NOTE:
Install the S4820T system into a rack or cabinet before installing any optional components.