Installing the S4820T, Unpacking the S4820T Switch, Package Contents
View all Dell Force10 S4820T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
4 Installing the S4820T To install the S4820T system, Dell Force10 recommends completing the installation procedures in the order presented in this chapter. Always handle the S4820T and its components with care. Avoid dropping the system or its Field Replaceable Units (FRUs). This chapter describes the installation procedures as follows: 1 Unpacking the S4820T Switch 2 Installing Rack or Cabinet Hardware a Installing the Dell ReadyRails System b Two-post Flush-mount Configuration c Two-post Center-mount Configuration d Four-post Threaded Configuration 3 Installing the S4820T Switch a 1U Front-rack Installation b Attaching the Ground Cable c Installing an AC or DC Power Supply 4 Installing QSFP+ Optics 5 Connecting the Stacking Ports (Optional) 6 Powering Up the S4820T Switch WARNING: Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4820T and its components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this system. Unpacking the S4820T Switch NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage. Package Contents When unpacking each S4820T switch, make sure that the following items are included: • One S4820T switch • One RJ-45 to DB-9 female cable • Two sets of rail kits (no tools required) Installing the S4820T | 21