Dell PowerApp 110 Rack Installation Guide - Page 13

Two-Post Flush-Mount Rack Kit Installation, Rack Kit Contents

Page 13 highlights

Two-Post Flush-Mount Rack Kit Installation This procedure provides instructions for installing a Dell PowerApp appliance in a twopost open-frame relay rack, such as those found in telecommunications equipment facilities. Both 3-inch and 6-inch wide 2-post racks are accommodated. The two-post open-frame relay rack must be properly secured to the floor, to the ceiling or upper wall, and where applicable, to adjacent racks, using floor and wall fasteners and bracing specified or approved by the rack manufacturer or by industry standards. Refer to the two-post open-frame relay rack manufacturer's installation documentation for precautionary warnings and information before attempting this installation. CAUTION: Do not attempt to install the PowerApp appliance into a twopost open-frame relay rack that has not been securely anchored in place. Damage to the appliance and personal injury may result. See "Safety Instructions" found earlier in this guide for additional safety information regarding rack installation. Rack Kit Contents The two-post flush-mount rack kit includes the following items (see Figure 1-4): • Two flush-mount brackets • Two inner mounting rails • Four 12-24 x 0.5-inch pan-head Phillips (or slotted) screws • Four 10-24 x 0.25-inch flat-head slotted screws for securing the inner mounting rails to the sides of the appliance • One 1-U template support.dell.com Rack Installation Guide 1-5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

support.dell.com
Rack Installation Guide
1-5
Two-Post Flush-Mount Rack Kit Installation
This procedure provides instructions for installing a Dell PowerApp appliance in a two-
post open-frame relay rack, such as those found in telecommunications equipment
facilities. Both 3-inch and 6-inch wide 2-post racks are accommodated.
The two-post open-frame relay rack must be properly secured to the floor, to the
ceiling or upper wall, and where applicable, to adjacent racks, using floor and wall
fasteners and bracing specified or approved by the rack manufacturer or by industry
standards. Refer to the two-post open-frame relay rack manufacturer’s installation
documentation for precautionary warnings and information before attempting this
installation.
CAUTION: Do not attempt to install the PowerApp appliance into a two-
post open-frame relay rack that has not been securely anchored in place.
Damage to the appliance and personal injury may result.
See “Safety Instructions” found earlier in this guide for additional safety information
regarding rack installation.
Rack Kit Contents
The two-post flush-mount rack kit includes the following items (see Figure 1-4):
°
Two flush-mount brackets
°
Two inner mounting rails
°
Four 12-24 x 0.5-inch pan-head Phillips (or slotted) screws
°
Four 10-24 x 0.25-inch flat-head slotted screws for securing the inner mounting
rails to the sides of the appliance
°
One 1-U template