Dell PowerEdge MX7000 EMC OpenManage Enterprise-Modular Edition Version 1.20.0 - Page 37

Retiring lead chassis, MCM dashboard, Controlling chassis power

Page 37 highlights

Retiring lead chassis You can use the retirement process of the existing lead chassis to make it a member chassis of the existing group or a standalone chassis. 1. On the MCM dashboard, click Configure > Retire Lead Chassis. The Retire Lead Chassis window is displayed. 2. Select one of the following options: ● Make it a member of the current group. ● Make it a stand-alone chassis. 3. Click Retire. Also, see the section, Use case scenarios. Any existing firmware baselines on the old lead chassis are imported to the new lead during retire, and a firmware compliance check job is initiated. Owing to rediscovery ordering of chassis during retire, the old lead is on-boarded after the compliance check for imported firmware baselines is completed. The ordering excludes the devices in the old lead chassis from the baseline report. To resolve this limitation, rerun the compliance check on the promoted lead after the retire job is completed so that the old lead devices are listed in the compliance or baseline report. After the retire lead task is completed, the system runs some internal tasks to complete the association of the groups that may take some time. Discrepancies, if any, occur for the devices information after the retire lead task is completed, they are reconciled automatically after the internal tasks are complete. MCM dashboard The MCM dashboard is displayed only when a multi-chassis management (MCM) group is created. You can view the name of MCM group on the left side of the dashboard. Below the group name, you can view the names, IPs, and service tags of the lead and member chassis. The lead chassis is indicated by the "LEAD" on the right side of the chassis name and the backup chassis is indicated by "BACKUP". Click View Topology to view the structure of the MCM group. The mid section of the MCM dashboard displays the health summary of all chassis, compute, networking, and storage devices in the MCM group. You can view the list of all the devices in the group by clicking All Devices at the upper right corner of the dashboard. Below the health summary, you can view the alerts that are based on criticality of the alert and device type. Click All Alerts to view the list of the alerts that are related to all events in the MCM group. You can view the details of the recent activities that are related to the group on the right side of the dashboard. The details comprise of the name and status of the activity, and timestamp of the activity. Click All Activity to view a list of all the activities that are related to the group, on the Jobs page. Controlling chassis power You can turn on and turn off the chassis power supply from the OME-Modular home page. If you turn off the chassis manually or a power grid failure results in turning off multiple chassis, IOMs, and compute sleds, then, turning on all the chassis and compute sleds may result in failed inventory jobs for two to three hours. However, the inventory jobs recover with no impact to the chassis and related components. To control the chassis power: 1. On the home page, click Power Control and select the required option. The available options are: ● Power Off (Non-graceful) ● Power Cycle System (Cold Boot) ● Power Off (Graceful) NOTE: After login, wait for 7 minutes, if the IP is unavailable, then check if: ○ The cable is connected. Logging in to OME-Modular 37

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122

Retiring lead chassis
You can use the retirement process of the existing lead chassis to make it a member chassis of the existing group or a stand-
alone chassis.
1.
On the MCM dashboard, click
Configure
>
Retire Lead Chassis
.
The
Retire Lead Chassis
window is displayed.
2.
Select one of the following options:
Make it a member of the current group.
Make it a stand-alone chassis.
3.
Click
Retire
.
Also, see the section,
Use case scenarios
.
Any existing firmware baselines on the old lead chassis are imported to the new lead during retire, and a firmware compliance
check job is initiated. Owing to rediscovery ordering of chassis during retire, the old lead is on-boarded after the compliance
check for imported firmware baselines is completed. The ordering excludes the devices in the old lead chassis from the
baseline report. To resolve this limitation, rerun the compliance check on the promoted lead after the retire job is completed
so that the old lead devices are listed in the compliance or baseline report.
After the retire lead task is completed, the system runs some internal tasks to complete the association of the groups that
may take some time. Discrepancies, if any, occur for the devices information after the retire lead task is completed, they are
reconciled automatically after the internal tasks are complete.
MCM dashboard
The MCM dashboard is displayed only when a multi-chassis management (MCM) group is created. You can view the name of
MCM group on the left side of the dashboard. Below the group name, you can view the names, IPs, and service tags of the lead
and member chassis. The lead chassis is indicated by the "LEAD" on the right side of the chassis name and the backup chassis is
indicated by "BACKUP".
Click
View Topology
to view the structure of the MCM group.
The mid section of the MCM dashboard displays the health summary of all chassis, compute, networking, and storage devices in
the MCM group. You can view the list of all the devices in the group by clicking
All Devices
at the upper right corner of the
dashboard.
Below the health summary, you can view the alerts that are based on criticality of the alert and device type. Click
All Alerts
to
view the list of the alerts that are related to all events in the MCM group.
You can view the details of the recent activities that are related to the group on the right side of the dashboard. The details
comprise of the name and status of the activity, and timestamp of the activity. Click
All Activity
to view a list of all the
activities that are related to the group, on the
Jobs
page.
Controlling chassis power
You can turn on and turn off the chassis power supply from the OME–Modular home page.
If you turn off the chassis manually or a power grid failure results in turning off multiple chassis, IOMs, and compute sleds, then,
turning on all the chassis and compute sleds may result in failed inventory jobs for two to three hours. However, the inventory
jobs recover with no impact to the chassis and related components.
To control the chassis power:
1.
On the home page, click
Power Control
and select the required option.
The available options are:
Power Off (Non-graceful)
Power Cycle System (Cold Boot)
Power Off (Graceful)
NOTE:
After login, wait for 7 minutes, if the IP is unavailable, then check if:
The cable is connected.
Logging in to OME-Modular
37