HP BladeSystem bc2500 Setup and Installation Guide HP BladeSystem bc2000 and b - Page 28
Engage the locking gear 3., the holes and release the rail, allowing it to lock into position 2.
View all HP BladeSystem bc2500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
5. Insert the rear of the right rack rail into the rack at the marks you made when measuring with the template. NOTE: The rack rails feature "L" and "R" markings to identify the left and right rack rails (from the front of the rack). 6. Compress the spring-loaded rack rail toward the rear of the rack (1). 7. Using the marks you made when measuring with the template, align the front of the right rail with the holes and release the rail, allowing it to lock into position (2). 8. Engage the locking gear (3). CAUTION: Rack rails must be installed as tightly as possible. Failure to obtain a correct fit may result in damage to equipment. Once the right rack rail is properly installed, install the left rack rail using the same procedure. 20 Chapter 4 Installing and Cabling the HP PC BladeSystem PC Blade Enclosure ENWW