4. Lift the left side of the device bay shelf to disengage the three tabs from the divider wall, and then remove it from the enclosure. To replace the component, reverse the removal procedure. Half-height or full-height blade CAUTION: This procedure provides instructions for replacement of a failed part only. To change the configuration of components, see the appropriate HP BladeSystem c-Class enclosure setup and installation guide. The c7000 enclosure is divided into four quadrants by the vertical support metal work. Within each quadrant, a removable divider supports half-height blades. To install a full-height blade in any quadrant, this divider must be removed. Therefore, a quadrant can only contain either full-height blades or halfheight blades. CAUTION: Failure to install the divider in a quadrant when installing half-height blades can result in damage to the connectors on the server blades. Removal and replacement procedures 36

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77

Removal and replacement procedures
36
4.
Lift the left side of the device bay shelf to disengage the three tabs from the divider wall, and then
remove it from the enclosure.
To replace the component, reverse the removal procedure.
Half-height or full-height blade
CAUTION:
This procedure provides instructions for replacement of a failed part only. To
change the configuration of components, see the appropriate HP BladeSystem c-Class
enclosure setup and installation guide.
The c7000 enclosure is divided into four quadrants by the vertical support metal work. Within each
quadrant, a removable divider supports half-height blades. To install a full-height blade in any quadrant,
this divider must be removed. Therefore, a quadrant can only contain either full-height blades or half-
height blades.
CAUTION:
Failure to install the divider in a quadrant when installing half-height blades can