HP Superdome SX2000 User Service Guide, Seventh Edition - HP Integrity Superdo - Page 8

Removing Protective Cardboard from the Housing, Rolling the Cabinet Down the Ramp - cell board

Page 8 highlights

List of Figures 1-1 Superdome History...17 1-2 Superdome Cabinet Components 19 1-3 UGUY...23 1-4 Management Processor...25 1-5 HUCB...26 1-6 HSO and RCS Locations...29 1-7 Backplane Power Supply Module 30 1-8 Backplane (Rear View)...30 1-9 Cell Board...31 1-10 Cell Memory...33 1-11 PCI-X I/O Rope Mapping...39 1-12 PCIe I/O Rope Mapping...41 1-13 e-Link Cable...43 1-14 Backplane Cables...44 1-15 Itanium Firmware Interfaces...45 1-16 PA-RISC Firmware Interfaces...47 2-1 PDCA Locations...52 2-2 Airflow Diagram...57 3-1 Normal Tilt Indicator...61 3-2 Abnormal Tilt Indicator ...62 3-3 Front of Cabinet Container...64 3-4 Cutting the Polystrap Bands...64 3-5 Removing the Ramps from the Pallet 65 3-6 Power Supply Mounting Screws Location 66 3-7 I/O Chassis Mounting Screws...66 3-8 Shipping Strap Location...68 3-9 Removing the Mounting Brackets 69 3-10 Positioning the Ramps...70 3-11 Rolling the Cabinet Down the Ramp 70 3-12 Blower Housing Frame...72 3-13 Removing Protective Cardboard from the Housing 73 3-14 Installing the Rear Blower Housing 73 3-15 Installing the Front Blower Housing 74 3-16 Installing the Blowers...75 3-17 Attaching the Rear Side Skin...76 3-18 Attaching the Front Side Skins...77 3-19 Attaching the Side Bezels...78 3-20 Attaching the Leveling Feet...79 3-21 Installing the Lower Front Door Assembly 80 3-22 Installing the Upper Front Door Assembly 81 3-23 Installing the Rear Blower Bezel...82 3-24 Installing the Front Blower Bezel 83 3-25 PDCA Assembly for Options 6 and 7 85 3-26 A 4-Wire Connector...85 3-27 A 5-Wire Connector...86 3-28 Installing the PDCA...86 3-29 Checking PDCA Test Points (5-Wire 87 3-30 Wall Receptacle Pinouts...88 3-31 Power Supply Indicator LED...89 3-32 Removing Front EMI Panel Screw 90 3-33 Removing the Back EMI Panel...90 3-34 Cable Labeling...91 8 List of Figures

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200

List of Figures
1-1
Superdome History
.......................................................................................................................
17
1-2
Superdome Cabinet Components
.................................................................................................
19
1-3
UGUY
............................................................................................................................................
23
1-4
Management Processor
.................................................................................................................
25
1-5
HUCB
.............................................................................................................................................
26
1-6
HSO and RCS Locations
................................................................................................................
29
1-7
Backplane Power Supply Module
.................................................................................................
30
1-8
Backplane (Rear View)
..................................................................................................................
30
1-9
Cell Board
......................................................................................................................................
31
1-10
Cell Memory
..................................................................................................................................
33
1-11
PCI-X I/O Rope Mapping
..............................................................................................................
39
1-12
PCIe I/O Rope Mapping
................................................................................................................
41
1-13
e-Link Cable
...................................................................................................................................
43
1-14
Backplane Cables
...........................................................................................................................
44
1-15
Itanium Firmware Interfaces
.........................................................................................................
45
1-16
PA-RISC Firmware Interfaces
........................................................................................................
47
2-1
PDCA Locations
............................................................................................................................
52
2-2
Airflow Diagram
...........................................................................................................................
57
3-1
Normal Tilt Indicator
....................................................................................................................
61
3-2
Abnormal Tilt Indicator
................................................................................................................
62
3-3
Front of Cabinet Container
............................................................................................................
64
3-4
Cutting the Polystrap Bands
..........................................................................................................
64
3-5
Removing the Ramps from the Pallet
............................................................................................
65
3-6
Power Supply Mounting Screws Location
....................................................................................
66
3-7
I/O Chassis Mounting Screws
.......................................................................................................
66
3-8
Shipping Strap Location
................................................................................................................
68
3-9
Removing the Mounting Brackets
.................................................................................................
69
3-10
Positioning the Ramps
...................................................................................................................
70
3-11
Rolling the Cabinet Down the Ramp
............................................................................................
70
3-12
Blower Housing Frame
..................................................................................................................
72
3-13
Removing Protective Cardboard from the Housing
.....................................................................
73
3-14
Installing the Rear Blower Housing
..............................................................................................
73
3-15
Installing the Front Blower Housing
.............................................................................................
74
3-16
Installing the Blowers
....................................................................................................................
75
3-17
Attaching the Rear Side Skin
.........................................................................................................
76
3-18
Attaching the Front Side Skins
......................................................................................................
77
3-19
Attaching the Side Bezels
..............................................................................................................
78
3-20
Attaching the Leveling Feet
...........................................................................................................
79
3-21
Installing the Lower Front Door Assembly
...................................................................................
80
3-22
Installing the Upper Front Door Assembly
...................................................................................
81
3-23
Installing the Rear Blower Bezel
....................................................................................................
82
3-24
Installing the Front Blower Bezel
..................................................................................................
83
3-25
PDCA Assembly for Options 6 and 7
............................................................................................
85
3-26
A 4-Wire Connector
.......................................................................................................................
85
3-27
A 5-Wire Connector
.......................................................................................................................
86
3-28
Installing the PDCA
.......................................................................................................................
86
3-29
Checking PDCA Test Points (5-Wire)
............................................................................................
87
3-30
Wall Receptacle Pinouts
................................................................................................................
88
3-31
Power Supply Indicator LED
........................................................................................................
89
3-32
Removing Front EMI Panel Screw
................................................................................................
90
3-33
Removing the Back EMI Panel
......................................................................................................
90
3-34
Cable Labeling
...............................................................................................................................
91
8
List of Figures