IBM 88743RU User Guide - Page 63

Label, Expansion, cables, according, where, connected, server., following, illustration., Connect,

Page 63 highlights

Protective cover 2. Label each end of the SMP Expansion cables according to where it will be connected to each server. See the following illustration. Node 1 Node 2 Node 3 Node 4 3. Connect the SMP Expansion cables to node 1: a. Connect one end of an SMP Expansion cable to port 1 on node 1; then, route the cable through the node 1 cable-management arm. Use a 2.3-m (7.6-foot) SMP Expansion cable for this connection. b. Connect one end of an SMP Expansion cable to port 2 on node 1; then, route the cable through the node 1 cable-management arm. Use a 2.3-m (7.6-foot) SMP Expansion cable for this connection. c. Connect one end of an SMP Expansion cable to port 3 on node 1; then, route the cable through the node 1 cable-management arm. Use a 2.3-m (7.6-foot) SMP Expansion cable for this connection. 4. Connect the SMP Expansion cables to node 2: a. Connect one end of an SMP Expansion cable to port 1 on node 2; then, route the cable through the node 2 cable-management arm. Use a 2.3-m (7.6-foot) SMP Expansion cable for this connection. Chapter 2. Installing options 51

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

Protective cover
2.
Label
each
end
of
the
SMP
Expansion
cables
according
to
where
it
will
be
connected
to
each
server.
See
the
following
illustration.
Node 2
Node 3
Node 4
Node 1
3.
Connect
the
SMP
Expansion
cables
to
node
1:
a.
Connect
one
end
of
an
SMP
Expansion
cable
to
port
1
on
node
1;
then,
route
the
cable
through
the
node
1
cable-management
arm.
Use
a
2.3-m
(7.6-foot)
SMP
Expansion
cable
for
this
connection.
b.
Connect
one
end
of
an
SMP
Expansion
cable
to
port
2
on
node
1;
then,
route
the
cable
through
the
node
1
cable-management
arm.
Use
a
2.3-m
(7.6-foot)
SMP
Expansion
cable
for
this
connection.
c.
Connect
one
end
of
an
SMP
Expansion
cable
to
port
3
on
node
1;
then,
route
the
cable
through
the
node
1
cable-management
arm.
Use
a
2.3-m
(7.6-foot)
SMP
Expansion
cable
for
this
connection.
4.
Connect
the
SMP
Expansion
cables
to
node
2:
a.
Connect
one
end
of
an
SMP
Expansion
cable
to
port
1
on
node
2;
then,
route
the
cable
through
the
node
2
cable-management
arm.
Use
a
2.3-m
(7.6-foot)
SMP
Expansion
cable
for
this
connection.
Chapter
2.
Installing
options
51