Intel BX80580Q9400 User Manual - Page 57

Net Detect Button

Page 57 highlights

Development Board Physical Reference Figure 8. Power On and Reset Buttons Power Button (SW1C1) Reset Button (SW1C2) CPU (U2E1) 4.5 Net Detect Button The board has one Net Detect push button switch (SW8E1) to support wireless LAN network detection in S0-S5. This button is connected on the SMC/KBC GPIO. When pressed, a manageability wake event is signaled to the ICH9M-E SFF via SMC/KBC, manageability planes are powered, and the 82567 wireless LAN performs the network detection. Figure 9. Net Detect Button Development Kit User's Manual 57

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

Development Board Physical Reference
Development Kit User’s Manual
57
Figure 8. Power On and Reset Buttons
4.5
Net Detect Button
The board has one Net Detect push button switch (SW8E1) to support wireless LAN
network detection in S0-S5. This button is connected on the SMC/KBC GPIO. When
pressed, a manageability wake event is signaled to the ICH9M-E SFF via SMC/KBC,
manageability planes are powered, and the 82567 wireless LAN performs the network
detection.
Figure 9. Net Detect Button
Power Button (SW1C1)
Reset Button (SW1C2)
CPU (U2E1)