Intel TIGI2U User Guide - Page 62
Fan connectors from J7A2, J8A1, J8A2 and J9A1
![]() |
UPC - 735858176958
View all Intel TIGI2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 62 highlights
Platform Installations and Upgrades 7. Disconnect the following cables on the Front Panel I/O Board: Power interface board power from J1A1 CD-ROM / DVD-ROM data and power cables from the rear of the CD-ROM or DVD-ROM drive Front panel data from J5A1 HDD connector from J5A2 Front panel USB from J4B1 System fan control connector from J7A1 Fan connectors from J7A2, J8A1, J8A2 and J9A1 Telco Alarms cable from J9A2 SCSI channel from J5B1 SCSI flex 1 from J9D1 SCSI flex 2 from J5C1 8. Remove the screws near the blind-mate connector (J2A1) and the fan assembly connector (J7A1). 9. Gently work the front panel I/O board backward (see letter "A" in Figure 39), toward the rear of the chassis to disengage the light pipe from behind the front mini-bezel. 10. Pull the front panel I/O board up over the placement pegs (see letter "B" in Figure 39) and lift it from the chassis (see letter "C" in Figure 39). Figure 39. Removing the Front Panel Board 62 Intel® Carrier Grade Server TIGI2U User Guide
![](/manual_guide/products/intel-tigi2u-user-guide-fa61d82/62.png)