Intel TIGI2U User Guide - Page 76

Securing SCSI Cable to Server Board Connector

Page 76 highlights

Platform Installations and Upgrades 4. Connect all cables to the server board. Note: If you forgot to install your SCSI cable prior to installing the server board, or you need to replace the SCSI cable without replacing the server board, secure the SCSI cable to the board connector and make sure it is fully seated with a #2 flat-blade screwdriver, as shown in the figure below. Figure 55. Securing SCSI Cable to Server Board Connector 5. Install the four-fan assembly. For instructions, see "Installing the Four-Fan Assembly." 6. Install the processor and heat sink. For instructions, see "Installing the Processor." 7. Install all DIMMs. For instructions, see "Installing DIMMs." 8. Push the handle on the front panel to baseboard connector towards the rear of the chassis. 9. Install the processor air duct. For instructions, see "Installing the Processor Air Duct." 10. Install the PCI riser assembly. For instructions, see "Installing a PCI Add-in Card." 11. Install the chassis cover. For instructions, see "Installing the Chassis Cover." 76 Intel® Carrier Grade Server TIGI2U User Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114

Platform Installations and Upgrades
Intel
®
Carrier Grade Server TIGI2U User Guide
76
4.
Connect all cables to the server board.
Note:
If you forgot to install your SCSI cable prior to installing the server board, or
you need to replace the SCSI cable without replacing the server board, secure
the SCSI cable to the board connector and make sure it is fully seated with a
#2 flat-blade screwdriver, as shown in the figure below.
Figure 55.
Securing SCSI Cable to Server Board Connector
5.
Install the four-fan assembly. For instructions, see
“Installing the Four-Fan Assembly.”
6.
Install the processor and heat sink. For instructions, see
“Installing the Processor.”
7.
Install all DIMMs. For instructions, see
“Installing DIMMs.”
8.
Push the handle on the front panel to baseboard connector towards the rear of the
chassis.
9.
Install the processor air duct. For instructions, see
“Installing the Processor Air Duct.”
10. Install the PCI riser assembly. For instructions, see
“Installing a PCI Add-in Card.”
11. Install the chassis cover. For instructions, see
“Installing the Chassis Cover.”