LiftMaster LA500 LA500 Manual - Page 13
Identify your installation type. The installation steps in this manual will show a typical Pull-to-Open application. - installation manual
View all LiftMaster LA500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
INSTALLATION TYPES Identify your installation type. The installation steps in this manual will show a typical Pull-to-Open application. PULL-TO-OPEN Column Install Post Install Gate Hinge Gate Hinge PUSH-TO-OPEN Column Install Gate Hinge SITE PREPARATION Post Install Gate Hinge Heavy Steel Plate for Reinforcement (Not provided) 10" Minimum Heavy Steel Bracket (Reinforce if necessary) Back Steel Bracket (Reinforce if necessary) Gate Hinge NOTE: Weld Re Bar Behind Gate Hinges for Maximum Strength. Top View Back Steel Plates for Reinforcement (Not provided) Heavy Steel Plate for Reinforcement (Not provided) Back Steel Bracket (Reinforce if necessary) Gate Hinge Gate Hinge NOTE: Weld Re Bar Behind Gate Hinges for Maximum Strength. Top View Heavy Steel Plate for Reinforcement (Not provided) Gate Hinge Control Box Operator SINGLE GATE ! Water Tight Conduit (Not provided) Earth Ground Rod Control Box Primary Operator ! DUAL GATE Secondary Operator Junction Box ! Water Tight Conduit (Not provided) Earth Ground Rod 11 Shielded low voltage wires.