LiftMaster LA500 LA500 Manual - Page 22
Dual Gates Only - driveway gate openers
View all LiftMaster LA500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
WIRING DUAL GATES ONLY INSTALL THE EXTENSION CABLE AND JUNCTION BOX Before digging, contact local underground utility locating companies. The following items are required to complete the junction box installation: • 4 x 4 Junction Box with 3/4" NPT threaded port holes • Screws • PVC Conduit 1 Trench across driveway to bury the extension cable. Use PVC conduit to prevent damage to cables. 2 Open the junction box by removing screws (4) and set aside. 3 Mount the junction box within 3 feet (0.9 m) of second operator. 4 Route operator cable and extension cable through watertight connector nut and watertight connector. 5 Insert cables and watertight connectors into the holes in the bottom of the junction box (not provided). 6 Feed extension cable through PVC conduit and secure with nut. Extension Cable ! PVC Conduit DUAL GATES ONLY Junction Box Operator Cable ! Within 3 feet WIRE THE EXTENSION CABLE TO THE SECONDARY OPERATOR 1 Insert wires from extension cable and operator cable into the terminal block connector as shown (like-colored wires must face each other). 2 Put wires inside of junction box. 3 Secure operator and extension cables with watertight connector nut. 4 Reinstall cover. Terminal Block Connector Extension Cable Operator Cable 20