LiftMaster LA500 LA500 Manual - Page 14

Mounting Options, Mounting Dos

Page 14 highlights

PREPARATION MOUNTING OPTIONS MOUNTING DOs ! MOUNTING OPTIONS ! Weld a horizontal bar across entire gate on any installation for strength. Make sure that the operator is mounted level or it will not function properly. MOUNTING DON'Ts An off-level installation may cause the gate or operator to fail prematurely. The operator can be mounted on top of the gate frame. ! DO NOT weld the crossbar on just a few pickets, or they could bend. ! DO NOT install upside down. ! DO NOT install on uphill or downhill gates. DO NOT install on ANY pedestrian passageways, doorways, or gates. DO NOT install next to sprinklers or any area that may expose the bottom of operator to water. 12 DO NOT over-bend the cord from the operator. Doing this will cause the wires to eventually break.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

12
MOUNTING OPTIONS
PREPARATION
!
!
!
!
!
DO NOT weld the crossbar on just a few pickets, or they could bend.
An off-level installation may cause the gate or operator to fail prematurely.
The operator can be mounted on top of the gate frame.
MOUNTING OPTIONS
DO NOT install upside down.
DO NOT install on ANY pedestrian passageways, doorways, or gates.
DO NOT install on uphill or downhill gates.
DO NOT install next to sprinklers
or any area that may expose
the bottom of operator to water.
DO NOT over-bend the cord from the operator.
Doing this will cause the wires to eventually break.
Weld a horizontal bar across entire gate on any installation for strength.
Make sure that the operator is mounted level or it will not function properly.
MOUNTING DOs
MOUNTING DON'Ts