Weider Body Blaster Force 4 Owners Manual - Page 29
Weight, Stack, Cable
View all Weider Body Blaster Force 4 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 29 highlights
'AGE 29 WEIDER SPORTING GOODS Fit the ends of the Dual Connector Bracket assembly on the Pec-Deck Cable into the Bracket assembly of the Lat Cable and pin together with a 3/8" X 2 1/2" LONG "L" PIN (131). Clip a 28 3/8" SPRING CLIP (59) onto the end of the 1" Pin to secure together. 62 131 62 59 0 0 0 0 29 131 59 62 Moving back down to the Base and the Pec-Deck Weight Stack Cable, fit a 3 112" PULLEY (J) (62) over the Cable and position it to the inside of the Pulley bracket welded to the side of the BASE FRAME (1). Fit a 3/8" I.D. X-..3/8" LONG METAL SPACER (132) between the Pulley and bracket and bolt in place with a 3/8" X 2" HEX HEAD BOLT (82) and 3/8" NYLON LOCK NUT (81). Locate the two OFFSET BEND PULLEY BRACKETS (52) and bolt the short ends of the Brackets around the loop end of the PEC-DECK WEIGHT STACK CABLE (29) with a 5/16" X 3/4" HEX HEAD BOLT (75) and 5/16" NYLON LOCK NUT (72). 62 29 PEG-DECK WEIGHT STACK CABLE 52 0 75 72 0 0 4 62 81 0 0 132