Weider Body Blaster Force 4 Owners Manual - Page 35

„-N

Page 35 highlights

u Now bring the Cable end up and insert it up through the Cable adjuster ferrule welded to the back of the HACK SQUAT FRAME (5). Lightly tighten the set screw against the Cable enough to keep it in place. D At this time, make another dual Cable connector assembly by bolting a 3 1/2' PULLEY (T) (62) and two 3/8" FLAT WASHERS (80) between two DUAL PULLEY CONNECTOR BRACKETS (51) with a 3/8" X 1 3/4" HEX HEAD BOLT (82) and a 3/8" NYLON LOCK NUT (81). Connect the bottom , of this assembly together by aligning a 3/8" I.D. X 1 1/4 LONG METAL SPACER (122) between the middle holes of the Brackets and bolting in place with a 1/4" X 1 3/4" ROUND HEAD SCREW (68) and 1/4" NYLON LOCK NUT (67). The object now is to adjust the Bench Press Cable (32) so that the dual Pulley assembly is at the same height as the dual Pulley assembly of the Pec-Deck assembly. To do this, hold the Pulley assembly at the same height as the Pec-Deck Pulley. Loosen the sot screw clamping the Cablein the Ferrule on the Squat Frame and pull the slack out of the Cable until the Cable is taught and the Pulley is fixed at the height of the Pec-Deck Pulley. lighten the set screw against the Cable to keep it set in place. Fit an additional ADJUSTER FERRULE (58) Into the Cable end and down atop the other Ferrule. 80 82 ED 0 0 51 80 / 62 51 28 62 PAGE 34 WEJDER SPORTING GOODS 0 81 0 cp 0 68 51 67 122 0 1 O O „-N 32 BENCH PRESS STATION 10 62 0

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

PAGE
34
WEJDER
SPORTING
GOODS
Now
bring
the
Cable
end
up
and
insert
it
up
through
the
Cable
adjuster
ferrule
welded
to
the
back
of
the
HACK
SQUAT
FRAME
(5).
Lightly
tighten
the
set
screw
against
the
Cable
enough
to
keep
it
in
place.
82
80
ED
0
0
80
/
D
At
this
time,
make
another
dual
Cable
connector
62
assembly
by
bolting
a
3
1/2'
51
PULLEY
(T)
(62)
and
two
3/8"
51
FLAT
WASHERS
(80)
between
two
DUAL
PULLEY
CONNECTOR
BRACKETS
28
(51)
with
a
3/8"
X
1
3/4"
HEX
62
HEAD
BOLT
(82)
and
a
3/8"
NYLON
LOCK
NUT
(81).
Connect
the
bottom
,
of
this
assembly
together
by
aligning
a
3/8"
I.D.
X
1
1/4
LONG
METAL
SPACER
(122)
between
the
middle
holes
of
the
Brackets
and
bolting
in
place
with
a
1/4"
X
1
3/4"
ROUND
HEAD
SCREW
(68)
and
1/4"
NYLON
LOCK
NUT
(67).
The
object
now
is
to
adjust
the
Bench
Press
Cable
(32)
so
that
the
dual
Pulley
assembly
is
at
the
same
height
as
the
dual
Pulley
assembly
of
the
Pec-Deck
assembly.
To
do
this,
hold
the
Pulley
assembly
at
the
same
height
as
the
Pec-Deck
Pulley.
Loosen
the
sot
screw
clamping
the
Cablein
the
Ferrule
on
the
Squat
Frame
and
pull
the
slack
out
of
the
Cable
until
the
Cable
is
taught
and
the
Pulley
is
fixed
at
the
height
of
the
Pec-Deck
Pulley.
lighten
the
set
screw
against
the
Cable
to
keep
it
set
in
place.
Fit
an
additional
ADJUSTER
FERRULE
(58)
Into
the
Cable
end
and
down
atop
the
other
Ferrule.
68
51
32
10
cp
0
67
122
0
0
1
81
O
O
„-N
62
0
0
BENCH
PRESS
STATION