3Ware 9550SXU16MLB10 User Guide - Page 141
Verifying Units, Verifying a Unit through 3DM
UPC - 693494971613
View all 3Ware 9550SXU16MLB10 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 141 highlights
Verifying Units Verifying Units For redundant units, verify checks the redundancy of the unit. For example it will check parity for a RAID 5 or check data consistency for a RAID 1. If the unit you checked is not a redundant unit, verify performs a surface scan of the media. During verification, I/O continues normally, but with a slight performance loss, depending on your verify rate setting. For more details about how verification works, see "About Verification" on page 122. For details about verify rates, see "Setting Background Task Rate" on page 124. For 9000 series controllers, if the verify unit process determines that the mirrored drives are not identical or the parity is not correct, the error is corrected. For RAID 1 and 10, this involves copying the miscompared data from the lower port(s) to the higher port(s) of the mirror. For RAID 5 this involves recalculating and rewriting the RAID 5 parity that was incorrect. AEN 36 (AEN_VERIFY_ERROR) is posted to the Alarms page. When this occurs for 7000/8000 series controllers, AEN 36 AEN_VERIFY_ERROR is logged and the entire unit is initialized. For RAID 1 and 10, initialization involves copying the data from the lower port(s) to the higher port(s) of the mirror. For RAID 5 this involves recalculating and rewriting the RAID 5 parity for the entire unit. If the unit is not redundant, a file-system check is recommended to correct the issue. If the errors persist and cannot be overwritten from a backup copy, perform a final incremental backup. You will need to replace the defective drive, recreate the unit, and reinstall the data. Note: If the unit has not previously been initialized and you manually select Verify Unit in either 3BM or 3DM, the initialization process starts. Verification of units can be done automatically, on a schedule, or can be started manually, as described below. For information about scheduling, see "Scheduling Background Tasks" on page 125. You can manually start a verify through either 3DM or 3BM. as described below. Verifying a Unit through 3DM 1 In 3DM, choose Management > Maintenance. 2 In the Unit Maintenance section of the Maintenance Page, select the unit you want to verify and click Verify Unit. 3DM puts the selected unit in verifying mode. If verify scheduling is not enabled on the Scheduling page, the verification process begins almost www.3ware.com 135