3Ware 9550SXU16MLB10 User Guide - Page 141

Verifying Units, Verifying a Unit through 3DM

Page 141 highlights

Verifying Units Verifying Units For redundant units, verify checks the redundancy of the unit. For example it will check parity for a RAID 5 or check data consistency for a RAID 1. If the unit you checked is not a redundant unit, verify performs a surface scan of the media. During verification, I/O continues normally, but with a slight performance loss, depending on your verify rate setting. For more details about how verification works, see "About Verification" on page 122. For details about verify rates, see "Setting Background Task Rate" on page 124. For 9000 series controllers, if the verify unit process determines that the mirrored drives are not identical or the parity is not correct, the error is corrected. For RAID 1 and 10, this involves copying the miscompared data from the lower port(s) to the higher port(s) of the mirror. For RAID 5 this involves recalculating and rewriting the RAID 5 parity that was incorrect. AEN 36 (AEN_VERIFY_ERROR) is posted to the Alarms page. When this occurs for 7000/8000 series controllers, AEN 36 AEN_VERIFY_ERROR is logged and the entire unit is initialized. For RAID 1 and 10, initialization involves copying the data from the lower port(s) to the higher port(s) of the mirror. For RAID 5 this involves recalculating and rewriting the RAID 5 parity for the entire unit. If the unit is not redundant, a file-system check is recommended to correct the issue. If the errors persist and cannot be overwritten from a backup copy, perform a final incremental backup. You will need to replace the defective drive, recreate the unit, and reinstall the data. Note: If the unit has not previously been initialized and you manually select Verify Unit in either 3BM or 3DM, the initialization process starts. Verification of units can be done automatically, on a schedule, or can be started manually, as described below. For information about scheduling, see "Scheduling Background Tasks" on page 125. You can manually start a verify through either 3DM or 3BM. as described below. Verifying a Unit through 3DM 1 In 3DM, choose Management > Maintenance. 2 In the Unit Maintenance section of the Maintenance Page, select the unit you want to verify and click Verify Unit. 3DM puts the selected unit in verifying mode. If verify scheduling is not enabled on the Scheduling page, the verification process begins almost www.3ware.com 135

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202

Verifying Units
www.3ware.com
135
Verifying Units
For redundant units, verify checks the redundancy of the unit. For example it
will check parity for a RAID 5 or check data consistency for a RAID 1. If the
unit you checked is not a redundant unit, verify performs a surface scan of the
media. During verification, I/O continues normally, but with a slight
performance loss, depending on your verify rate setting. For more details
about how verification works, see “About Verification” on page 122. For
details about verify rates, see “Setting Background Task Rate” on page 124.
For 9000 series controllers, if the verify unit process determines that the
mirrored drives are not identical or the parity is not correct, the error is
corrected. For RAID 1 and 10, this involves copying the miscompared data
from the lower port(s) to the higher port(s) of the mirror. For RAID 5 this
involves recalculating and rewriting the RAID 5 parity that was incorrect.
AEN 36 (AEN_VERIFY_ERROR) is posted to the Alarms page.
When this occurs for 7000/8000 series controllers, AEN 36
AEN_VERIFY_ERROR is logged and the entire unit is initialized. For RAID
1 and 10, initialization involves copying the data from the lower port(s) to the
higher port(s) of the mirror. For RAID 5 this involves recalculating and
rewriting the RAID 5 parity for the entire unit. If the unit is not redundant, a
file-system check is recommended to correct the issue. If the errors persist and
cannot be overwritten from a backup copy, perform a final incremental
backup. You will need to replace the defective drive, recreate the unit, and
reinstall the data.
Note:
If the unit has not previously been initialized and you
manually select
Verify Unit
in either 3BM or 3DM, the
initialization process starts.
Verification of units can be done automatically, on a schedule, or can be
started manually, as described below. For information about scheduling, see
“Scheduling Background Tasks” on page 125.
You can manually start a verify through either 3DM or 3BM. as described
below.
Verifying a Unit through 3DM
1
In 3DM, choose
Management > Maintenance
.
2
In the
Unit Maintenance
section of the Maintenance Page, select the unit
you want to verify and click
Verify Unit
.
3DM puts the selected unit in verifying mode. If verify scheduling is not
enabled on the Scheduling page, the verification process begins almost