Compaq ProLiant 6400R Compaq Parallel Database Cluster Model PDC/05000 for Ora - Page 165

Upgrading Oracle8i Server, Upgrading the OSDs, Upgrading the Ethernet OSDs

Page 165 highlights

Cluster Management 6-11 Upgrading Oracle8i Server The design of the PDC/O5000 is tightly integrated with Oracle8i Server. Significant changes in Oracle8i Server will likely affect the operation of the cluster. Before upgrading to any new release of Oracle8i Server, consult your Compaq and Oracle service representatives. Make sure that the new release is certified and supported on the PDC/O5000, and get assistance to determine which procedure you should follow to perform the upgrade properly. Upgrading the OSDs During the life of your PDC/O5000, you will need to upgrade the operating system dependent modules as new versions are released. Before beginning the upgrade procedure: 1. Make sure that the person performing the upgrade has administrative privilege on each cluster node. 2. Make sure that all cluster nodes are active. From each node, run the ping utility to verify that every node recognizes the other nodes by host name. 3. Shut down the Oracle database on all nodes. 4. Stop the Oracle services (OracleCMService, OracleNMService, and OracleServiceSID) on all nodes. Once you have completed these steps, you can deinstall the existing OSDs and install the new versions as described in the following subsections. Upgrading the Ethernet OSDs To upgrade the Ethernet OSDs: 1. Insert the CD containing the new revision of the OSDs into the CD-ROM drive on the primary node. (This is the node that was used for the previous installation of the OSDs.) The Oracle Universal Installer window is displayed.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233

Cluster Management
6-11
Upgrading Oracle8
i
Server
The design of the PDC/O5000 is tightly integrated with Oracle8
i
Server.
Significant changes in Oracle8
i
Server will likely affect the operation of the
cluster.
Before upgrading to any new release of Oracle8
i
Server, consult your Compaq
and Oracle service representatives. Make sure that the new release is certified
and supported on the PDC/O5000, and get assistance to determine which
procedure you should follow to perform the upgrade properly.
Upgrading the OSDs
During the life of your PDC/O5000, you will need to upgrade the operating
system dependent modules as new versions are released.
Before beginning the upgrade procedure:
1.
Make sure that the person performing the upgrade has administrative
privilege on each cluster node.
2.
Make sure that all cluster nodes are active. From each node, run the ping
utility to verify that every node recognizes the other nodes by host
name.
3.
Shut down the Oracle database on all nodes.
4.
Stop the Oracle services (OracleCMService, OracleNMService, and
OracleService
SID
) on all nodes.
Once you have completed these steps, you can deinstall the existing OSDs and
install the new versions as described in the following subsections.
Upgrading the Ethernet OSDs
To upgrade the Ethernet OSDs:
1.
Insert the CD containing the new revision of the OSDs into the
CD-ROM drive on the primary node. (This is the node that was used for
the previous installation of the OSDs.)
The
Oracle Universal Installer
window is displayed.