Fujitsu MHM2150AT Manual/User Guide - Page 148
Indicates that Execute Off-Line Immediate is supported., is not supported.
View all Fujitsu MHM2150AT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 148 highlights
5.3 Host Commands Self-test execution status 0 1 2 3 4 5 6 7 8 to 14 15 Meaning Self-test has been completed normally or has not been executed. Self-test has been stopped by the host computer. Self-test has been suspended by hard or soft reset. Self-test has been aborted by a fatal error. Self-test has been completed abnormally by an unknown meaning. Self-test has been completed abnormally by write test. Self-test has been completed abnormally by serbo test. Self-test has been completed abnormally by read test. Reserved Self-test is in progress. • Off-line data collection capability Indicates the method of off-line data collection carried out by the drive. If the off-line data collection capability is 0, it indicates that off-line data collection is not supported. Bit Meaning 0 Indicates that Execute Off-Line Immediate is supported. 1 Vendor unique 2 Indicates that off-line data collection being executed is aborted when a new command is received. 3 Indicates that supports off-line read scan function. 4 Indicates that supports self-test function. • Failure prediction capability flag Bit 0: The attribute value data is saved to a media before the device enters power saving mode. Bit 1: The device automatically saves the attribute value data to a media after the previously set operation. Bits 2 to 15: Reserved bits • Error logging capability Bit 0: Indicates that error logging function. Bits 1 to 7: Reserved bits C141-E104-03EN 5-71