HP 6125G HP 6125G & 6125G/XG Blade Switches Installation Guide-6W100 - Page 8

Opening the ejector lever, Sliding the blade switch into the interconnect bay, Otherwise

Page 8 highlights

Figure 3 Opening the ejector lever 2 1 5. Slide the blade switch into the interconnect bay (see callout 1 in Figure 4) until it touches the backplane. 6. Push the ejector lever to the closed position. (See callout 2 in Figure 4). Figure 4 Sliding the blade switch into the interconnect bay 7. Verify that the Health LED is green after the blade switch starts up. Otherwise, check the installation. 8. Choose proper cables for the blade switch. For more information about ports, see "Ports." For more information about cable installation, see "Connecting the blade switch to the network." 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35

4
Figure 3
Opening the ejector lever
5.
Slide the blade switch into the interconnect bay (see callout 1 in
Figure 4
) until it touches the
backplane.
6.
Push the ejector lever to the closed position. (See callout 2 in
Figure 4
).
Figure 4
Sliding the blade switch into the interconnect bay
7.
Verify that the Health LED is green after the blade switch starts up.
Otherwise, check the installation.
8.
Choose proper cables for the blade switch.
For more information about ports, see "
Ports
." For more information about cable installation, see
"
Connecting the blade switch to the network
."
1
2